t ~ <br /> • Page 2 <br /> <br /> Run Date: 00/06/2007 09:49:51 <br /> City of Eugene <br /> - Contract Preliminary Progress Payment <br /> Payment No 001 <br /> Contractor: EUGENE SAND & GRAVEL Original Contract: $1,186,499.10 <br /> Job 93-004341 Current Amount: $1,186,499.10 <br /> Contract No: 2007-00026 Contract Award Date: 06/25/2007 <br /> PO 2007100421 Completion Date: 11/01/2007 <br /> Assessable: No <br /> Current Contract Estimated Payment Cumulative Totals 8 Complete <br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity _ Amount Quantity Amount Quantity Amount <br /> PPP H 18TH; AGATE ST - HILYARD ST <br /> General <br /> 0000 Liquidated Damages E. 18th/Aga ($500.00) DAY 0.000 $0.00 0.000 $0.00 0.00 <br /> 0010 MOBILIZATION ~/~sf'~Z~,///,~Q~3>M,~\ $50,000.00 LUMPSUM 1.000 $50,000.00 1.000 $50,000.00 1.000 $50,000.00 100.00 <br /> 0020 TEMP WORK ZONE TRAFFIC CONTRq~6Io"'~'Y ~W'~L'f7~~J $16 500 00 LUMPSUM 1 000 $16 500.00 0 300 $4,950.00 0-300 _ $4,950.00 30.00 <br /> 0030 TEMPORARY STRIPING L - 4341 ~ $1,500.00 LUMPSUM 1.000 $1,500.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0040 FLAGGERS $40.00 HOUR 500.000 $20,000.00 120.500 $4,820.00 120.500 $4,820.00 24.00 <br /> 0050 CITY PROVIDED SPEC INFO SIGNS $200.00 EACH 4.000 $800.00 2.000 $400.00 2.000 $400.00 50.00 <br /> 0060 EROSION CONTROL I'/,~h.7 ~Lww \ $4,000.00 LUMPSUM 1.000 $4,000.00 0.300 $1,200.00 0.300 $1,200.00 30.00 <br /> 0070 TREE PROTECTION C!~^y l,~~ ~`rTZ J $1,000.00 LUMPSUM 1.000 $1,000.00 0.300 $300.00 0.300 $300.00 30.00 <br /> 0080 TREE REMOVAL $400.00 EACH 12.000 $4,800.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0090 FENCB, REMOVB $3.00 LINFT 240.000 5720.00 301.000 $903.00 301.000 $903.00 125.00 <br /> 0100 REMOVE PARKING METER POST $40.00 EACH 22.000 $880.00 22.000 $880.00 22.000 $880.00 100.00 <br /> 0110 REMOVE AND SALVAGE SIGN $50.00 EACH 2.000 $100.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0120 REMOVE CATCH BASIN $150.00 EACH 1.000 $150.00 1.000 $150.00 1.000 $150.00 100.00 <br /> 0130 ALTER EX FENCE POST BASE ,,II,,,,II~~C~ A \ $20.00 EACH 81.000 $1,620.00 46.000 $920.00 46.000 $920.00 57.00 <br /> 0140 15 IN SURFACING STABILIZATION ~Iy~W (o - 4 ~`T~ / $100 00 CUYD 1 500 $150 00 0 000 $0 00 0.000 $0.00 _ 0.00 <br /> 0150 17 IN. SURFACING STABILIZATION ~ $75.00 CUYD 76.000 $5,700.00 52.300 $3,922.50 52.300 $3,922.50 69.00 <br /> 0160 GENERAL E7CCAVATION C~~~ S~~Z ~ $40.00 CUYD 610.000 $24,400.00 812.300 $32,992.00 812.300 $32,492.00 133.00 <br /> 0170 3 INCH SD PVC PIPE ,L $5.00 FOOT 32.000 $160.00 32.000 $160.00 32.000 $160.00 100.00 <br /> 0180 10 INCH SD PVC PIPE ~ ~~P°Io - '¢;4 \l/ $80.00 FOOT 52.000 $4, 160.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0190 10 INCH SD C900 PIPE I(pC¢ b ~ ~ ~ L" $105.00 FOOT 23.000 $2,415.00 10.000 $1,050.00 10.000 $1,050.00 43.00 <br /> 0200 12 INCH SD PVC PIPE I(bC~7°~ 4,A1~~~ $100 00 FOOT 7 000 $700 00 0 000 $0 00 0 000 $0.00 0.00 <br /> 0210 PIPE TEES, 10 INCH L ~fFYI°~ _ ~~f'T~ Z~ $300.00 EACH 1.000 $300.00 0.000 $0.00 0.000 $0.00 0.00 <br /> <br />