Page 2 <br /> Fun Date: 04/04/7.008 15:04:39 City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 008 Pinal Pay <br /> Contractor: EUGENE SAND S GRAVEL Original Contract: $1,186,499.10 <br /> Current Amount: $1,373,019.57 <br /> Job 93-004341 <br /> Contract No: 2007-00026 Contract Award Date: 06 25 2007 <br /> PO 2007100421 Completion Date: 11/01/2007 <br /> Assessable: No <br /> Estimated Pa ent Cumulative Totals i Complete <br /> Current Contract ns Amount <br /> Amount Quantity Amount Quantity <br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity <br /> PPP E 18TH: AGATE ST - HZLYARD 3T 4~l /C~ U~ Z <br /> General ` <br /> 0.000 50.00 0.000 $0.00 0.00 <br /> 0000 Liquidated Damages E. 18th/Aga ($500.00) DAY <br /> 0010 MOBILIZATION $50,000.00 LUMPSUM 1.000 $50,000.00 0.000 $0.00 1.000 $50,000.00 100.00 <br /> 0020 TEMP. WORK ZONE TRAFFIC CONTRO $16,500.00 LUMPSUM 1.000 $16,500.00 0.000 $0.00 1.000 $16,500.00 100.00 <br /> 252.000 $441.00 0.000 $0.00 252.000 $441.00 100.00 <br /> 0021 CONSTRUCTION FENCING 001 $1.75 LZNFT <br /> 0030 TEMPORARY STRIPING $1,500.00 LUMPSUM 1.000 $1,500.00 0.000 $0-00 1.000 $1,500.00 100.00 <br /> 0040 FLAGGSRS $40.00 HOUR 500.000 $20,000.00 .0.000 $0.00 556.500 $22,260.00 111.00 <br /> 4.000 $800.00 0.000 $0.00 4.000 $800.00 100.00 <br /> 0050 CITY PROVIDED SPEC INFO SIGNS $200.00 EACH <br /> 0060 EROSION CONTROL $4,000.00 LUMPSUM 1.000 $4,000.00 0.000 $0-00 1.000 $4,000.00 100.00 <br /> 0070 TREfi PROTECTION $1,000.00 LUMPSUM 1.000 $1,000.00 0.000 $0.00 1.000 $1,000.00 100.00 <br /> 0080 TRSE REMOVAL $400.00 EACH 12.000 $4,800.00 0.000 $0.00 12.000 $4,800.00 100.00 <br /> $3.00 LZNFT 240.000 $720.00 0.000 $0.00 301.000 $903.00 125.00 <br /> 0090 FHNCS, RSMOVS <br /> 0100 REMOVS PARKING METER POST $40.00 EACH 22.000 $880.00 0.000 $0.00 22.000 $880.00 100.00 <br /> 0110 REMOVH AND 311LVAGE SI@i $50.00 8ACA 2.000 $100.00 0.000 $0.00 6.000 $300.00 300.00 <br /> 0120 REMOVE CATCH BASZN $150.00 EACH 1.000 $150.00 0.000 $0.00 1.000 $150.00 100.00 <br /> 0130 ALTER EX FENCS POST BASE $20.00 EACH 81.000 $1,620.00 0.000 $0.00 46.000 $920.00 57.00 <br /> 1.000 $665.28 0.000 $0.00 1.000 $665.28 100.00 <br /> 0131 MODIFY SIDSWALK 002 $665.28 LUMPSUM <br /> 0140 15 IN. SDRFACINO STABILIZATION $100.00 CDYD 1.500 $150.00 0.000 $0.00 2.300 $230.00 153.00 <br /> 76.000 $5,700.00 0.000 $0.00 124.100 $9,307.50 163.00 <br /> 0150 17 IN. SIIRFACIHO STABILIZATZON $75.00 CDYD <br /> 0160 GII781W, BZCAVATION $40.00 COYD 610.000 $24,400.00 0.000 $0.00 1,124.300 $44,972.00 184.00 <br /> <br /> ' 0170 3 INCH SD PVC PIPE $5.00 FOOT 32.000 $160.00 0.000 $0.00 41.000 $205.00 128.00 <br /> 0180 10 INCH SD PVC PIPE $80.00 FOOT 52.000 $4,160.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0190 10 INCH SD C900 PIPE $105.00 FOOT 23.000 $2,415.00 0.000 $0.00 23.000 $2,415.00 100.00 <br /> <br />