<br /> Run Date: 09/11/2007 ,12:37:41 Page 2 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 002 <br /> Contractor: EUGENE SAND 6 GRAVEL Original Contract: $1,186,499.10 <br /> Job 93-004341 Current Amount: $1,186,499.10 <br /> Contract No: 2007-00026 Contract Award Date: 06/25/2007 <br /> pO 2007100421 Completion Date: 11/01/2007 <br /> Assessable: No <br /> Current Contract Estimated Payment Cumulative Totals 6 Complete <br /> Line Description Last C'hng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> PPP B 18TH; AGATH ST - EILYARD ST <br /> General <br /> 0000 Liquidated Damages E. 18th/Aga ($500.00) DAY 0.000 $0.00 0.000 $0.00 0.00 <br /> 0010 MOBILIZATION y0%o ~ $50,000.00 LUMPSUM 1.000 $50,000.00 0.000 $0.00 1.000 $50,000.00 100.00 <br /> 0020 TEMP. WORK ZONE TRAFFIC CONTRO `IU `o 4U`~,~ $16,500.00 LUMPSUM 1.000 $16,500.00 0.300 $4,950.00 0.600 $9,900.00 60.00 <br /> 0030 TEMPORARY STRIPING ~ $1,500.00 LUMPSUM 1.000 $1,500.00 0.500 $750.00 0.500 $750.00 50.00 <br /> 0040 FLAGGERS I $40.00 HOUR 500.000 $20,000.00 263.000 $10,520.00 383.500 $15,340.00 77.00 <br /> 0050 CITY PROVIDED SPEC INFO SIGNS I $200.00 EACH 4.000 $800.00 0.000 $0.00 2.000 $400.00 50.00 <br /> 0060 EROSION CONTROL _ $4,000.00 LUMPSUM 1.000 $4,000.00 0.300 $1,200.00 0.600 $2,400.00 60.00 <br /> 0070 TREE PROTECTION 3:~~ $1,000.00 LUMPSUM 1.000 $1,000.00 0.300 $300.00 0.600 $600.00 60.00 <br /> 1,;~ <br /> 0080 TREE REMOVAL ~ $400.00 EACH 12.000 $4,800.00 12.000 $4,800.00 12.000 $4,800.00 100.00 <br /> 0090 P~iCH, RHMOVB $3.00 LINPT 240.000 5720.00 0.000 $0.00 301.000 $903.00 125.00 <br /> 0100 REMOVE PARKING METER POST $40.00 EACH 22.000 $880.00 0.000 $0.00 22.000 $880.00 100.00 <br /> 0110 REMOVE AND SALVAGE SIGN $50.00 EACH 2.000 $100.00 2.000 $100.00 2.000 $100.00 100.00 <br /> 0120 REMOVE CATCH BASIN $150.00 EACH 1.000 $150.00 0.000 $0.00 1.000 $150.00 100.00 <br /> 0130 ALTER EX FENCE POST BASE $20.00 EACH 81.000 $1,620.00 0.000 $0.00 46.000 $920.00 57.00 <br /> 0140 15 IN. 3VRFACING STABILIZATION $100.00 CUYD 1.500 $150.00 2.300 $230.00 2.300 $230.00 153.00 <br /> 0150 17 IN. 3URPACING STABILIZATION - $75.00 CUYD 76.000 $5,700.00 71.800 $5,385.00 124.100 $9,307.50 163.00 <br /> 0160 GHNSRAL HYCAVATION lub`%~ $40.00 CUYD 610.000 $24,400.00 312.000 $12,480.00 1,124.300 $44,972.00 184.00 <br /> 0170 3 INCH SD PVC PIPE + ~ $5.00 FOOT 32.000 $160.00 3.000 $15.00 35.000 $175.00 109.00 <br /> I <br /> 0180 10 INCH SD PVC PIPE I lob'~o $80.00 FOOT 52.000 $4,160.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0190 10 INCH SD C900 PIPE loop I $105.00 FOOT 23.000 $2,415.00 13.000 $1,365.00 23.000 $2,415.00 100.00 <br /> 0200 12 2NCH 3D PVC PIPS ' iuU'+~ $100.00 FOOT 7.000 5700.00 57.000 $5,700.00 57.000 $5,700.00 814.00 <br /> 0210 PIPE TEES, 10 INCH I'~b ''7 1~1 $300.00 EACH 1.000 $300.00 1.000 $300.00 1.000 $300.00 100.00 <br /> <br />