<br /> Run Date: 01/03/2008 15:14:11 Page 3 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> • Payment No 006 <br /> -Contractor: EUGENE SAND 6 GRAVEL Original Contract: $1,186,499.10 <br /> .lob 93-004341 Current Amount: $1,236,470.67 <br /> Contract No: 2007-00026 Contract Award Date: 06/25/2007 <br /> PO 2007100421 Completion Date: 11/01/2007 <br /> Assessable: No <br /> Current Contract Estimated Payment Cumulative Totals 6 Complete <br /> <br /> Line Description Laet Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> 0200 12 INCR SD PVC PIPH 5100.00 FOOT 7.000 $700.00 0.000 $0.00 57.000 $5,700.00 814.00 <br /> 0210 PIPE TEES, 10 INCH $300.00 EACH 1.000 $300.00 0.000 $0.00 1.000 $300.00 100.00 <br /> 0220 REM/REPL CATCHBASIN W/BIKE PRO $1,500.00 EACH 1.000 $1,500.00 0.000 $0.00 1.000 $1,500.00 100.00 <br /> 0230 CURB INLET 4 A $1,800.00 EACH 3.000 $5,400.00 0.000 $0.00 3.000 $5,400.00 100.00 <br /> 0240 CATCH BASIN TRAP $500.00 EACH 2.000 $1,000.00 0.000 $0.00 1.000 $500.00 50.00 <br /> 0250 ADJUSTING BOXES $300.00 EACH 2.000 $600.00 0.000 $0.00 2.000 $600.00 100.00 <br /> 0251 MAJOR ADJ. MH 5471 002 $1,663.62 LUMPSUM 1.000 $1,663.62 0.000 $0.00 1.000 $1,663.62 100.00 <br /> 0260 MINOR ADJUSTMENT OF MANHOLES $1,000.00 EACH 16.000 $16,000.00 0.000 $0.00 16.000 $16,000.00 100.00 <br /> 0270 MH REM/REPL FRAME/COVER-WW $250.00 EACH 13.000 $3,250.00 0.000 $0.00 8.000 $2,000.00 62.00 <br /> 0280 MH RHM/RHPL FRAMH/COVHR-ST $250.00 HACH 3.000 $750.00 0.000 50.00 7.000 $1,750.00 433.00 <br /> 0290 TRENCH GRATE $150.00 SQFT 30.000 $4,500.00 0.000 $0.00 30.000 $4,500.00 100.00 <br /> 0300 PLUG EX. PIPE END WITH CONCRET $100.00 EACH 2.000 $200.00 0.000 $0.00 2.000 5200.00 100.00 <br /> 0310 RETAINING WALL, MSE $21.00 SQFT 870.000 $18,270.00 0.000 $0.00 840.000 $17,640.00 97.00 <br /> 0320 COLD PLANH PVMT REMOVAL, 2" D $0.50 9QFT 26,910.000 513,455.00 0.000 $0.00 41,903.000 $20,951.50 156.00 <br /> 0330 COLD PLANE PVMT REMOVAL, 4" DE $0.50 SQFT 44,619.000 $22,309.50 0.000 $0.00 33,654.000 $16,827.00 75.00 <br /> 0340 COLD PLANE PVMT REMOVAL, VARIA $0.40 SQFT 43,370.000 $17,348.00 0.000 $0.00 42,744.000 $17,097.60 99.00 <br /> 0350 COLD PLANE PVMT REMOVAL 0" TO $0 50 SQFT 8 520 000 $4 260.00 0.000 $0.00 4 350.000 $2,175.00 51.00 <br /> 0360 1 1/2" - 0• AOGRHGATB BA88 $20.00 TON 110.000 S2,200.00 0.000 50.00 305.200 $6,104.00 277.00 <br /> 0370 LEVEL 2, 3/8 IN DENSE HMAC $75.00 TON 245.000 $18,375.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0380 LEVEL 2, 1/2 IN DENSE HMAC $50.00 TON 2,280.000 $114,000.00 0.000 $0.00 2,253.800 $112,690.00 99.00 <br /> 0390 PLAIN CONCRETE PVMT, UNDOWELED $7.00 SQFT 4,850.000 $33,950.00 0.000 $0.00 2,593.000 $15,151.00 53.00 <br /> 0400 PLAIN CONCRETE PVMT, DOWELED, $17.00 SQFT 55.000 $935.00 0.000 $0.00 50.200 $853.40 91.00 <br /> 0401 CONST. REINFORCED DWY 001 $7.94 SQFT 371.000 $2,945.74 0.000 $0.00 371.000 $2,945.74 100.00 <br /> 0410 CONCRETE CURBS $18.00 FOOT 814.000 $14,652.00 0.000 $0.00 771.700 $13,890.60 95.00 <br /> <br />