<br /> • Contract Preliminary Progress Payment
<br /> Payment No : 007
<br /> Contractor: EUGENE SAND & GRAVEL
<br /> Job 93-004422 Original Contract: $1,186,499.10
<br /> Contract No: 2007-00026 Current Amount: $1,368,079.96
<br /> PO 2007100421 Contract Award Date: 06/25/2007
<br /> Assessable: No Completion Date: 11/01/2007
<br /> Line Description Current Contract Estimated Payment Cumulative Totals
<br /> Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity
<br /> Amount Quantity Amount } C~Pl@t
<br /> 0810 EROSION CONTROL $2,500.00 LUMPSUM 1.000 $2,500.00 0.000
<br /> 0820 REMOVAL OF INLHT3 $150.00 EACH 2.000 $300.00 0.000 $0.00 2.000 $2,500.00 1 VO.bO
<br /> $0.00 3.000 S450.00
<br /> 0830 REMOVAL OF PZPfiS $10.00 FOOT 260.000 $2,600.00 O.ODO 150•b0
<br /> $o.oo lso.ooo Sl,soo.oo
<br /> 0840 12 IN. SURFACING STABILIZATION $120.00 CUYD 140.000 $16,800.00 0.000 58.00
<br /> $0.00 197.800 523,736,00
<br /> 0850 13 IN. 9VRPACING STABILIZATZON $120.00 CVYD 8.000 $960.00 0.00041.00
<br /> 50.00 13.400 $1,608.00
<br /> 0860 17 ZN. SURFACING STABILIZATION $40.00 CUYD 271.000 $10,840.00 0.000 168.Op
<br /> $0.00 283.600 $11,344.00
<br /> 0870 10 INCH C900 STORM PIPE $90.00 FOOT 330.000 $29,700.00 0.000 1pS'DO
<br /> $0.00 397.000 $35,730.00
<br /> 0880 10 INCH pVC STORM PIPE $100.00 FOOT 66.000 120.00
<br /> $6,600.00 0.000 $0.00 0.000 $0.00
<br /> 0890 15 INCH CONCRETE SEALED JDINT $100.00 FOOT 50.000 $5,000.00 0.000 0'00
<br /> $0.00 53.000 $5,300.00
<br /> 0900 18 INCH pVC STORM PIPE $110.00 FOOT 1p6. 0
<br /> 10.000 $1,100.00 0.000 $0.00 10.000 D
<br /> $1,100.00 100 00
<br /> 0910 29 ZNCH PVC STORM PIPE $150.00 FOOT 45.000 $6,750.00 0.000
<br /> So.oo so.oao 57,500.00
<br /> 0911 48" PIPE W/MANHOLE 003 $127,874.14 LIIMPSUM 111.00
<br /> 1.000 $127,879.14 1.000 $127,874.14 1.000
<br /> $127,874.14
<br /> 0920 PIPE TEES, 10 INCH $600.00 EACH 100.00
<br /> 1.000 $600.00 0.000 $0.00 0.000
<br /> $0.00 0.00
<br /> 0930 CONCRETE CLOSURE COLLARS $850.00 EACH 1.000 $850.00 0.000
<br /> $0.00 1.000 $850.00
<br /> 0940 CONCRETE MANHOLE, FLAT TOP $2,750.00 EACH 100.00
<br /> 3.000 $8,250.00 0.000 $0.00 3.000
<br /> $8,250.00 100.00
<br /> 0950 CONCRETE INLETS, TYPE 4A $1,700.00 EACH 2.000 $3,400.00 0.000
<br /> $0.00 2.000 $3,400.00
<br /> 0960 CATCH BASINS, W/HIRB PROOP GRA 100.00
<br /> $1,350.00 BACH 2.000 $2,700.00 0.000 $0.00 3.000
<br /> $4,050.00 150.00
<br /> 0970 REM/AEPL CONCRETE CATCH BASIN $1,350.00 EACH 5.000 $6,750.00 0.000
<br /> 0980 ADJUSTING BOXES $350.00 EACH $0.00 3.000 $4,050.00 60.00
<br /> 5.000 $1,750.00 0.000 $0.00 4.000
<br /> $1,400.00 80.00
<br /> 0990 FILLING ABANDONED STRUCTURES $450.00 EACH 4.000 $1,800.00 0.400
<br /> $0.00 4.000 $1,800.00 100.00
<br /> 1000 FILLING ABANDONED PIP83 $150.00 CVYD 52.000 $7,800.00 0.000
<br /> $0.00 80.500 S12,075.00 155,00
<br /> 1010 PLUG HR. YZP8 8ND WITH CONCRBT $100.00 EACH 6.000 $600.00 0.000
<br /> $0.00 10.000
<br /> 1011 REMOVE CONCRETE PLUG 002 $682.06 LUMPSUM 1.000 $682.06 0.000 51,000.00 167.00
<br /> 1012 CHIP CONCRETE 003 $3,389.22 LUMPSUM 1.000 $3,389.22 1.000 0.00 1.000 $682.06 1DO,pD
<br /> $3,389.22 1.000 $3,389.22