Run Date: 02/06/2008, 11:42:31 <br /> City of Eugene Page 2 <br /> Contract Preliminary Progress Payment <br /> Payment No 007 <br /> Contractor: EUGENE SAND & GRAVEL Original Contract: <br /> Job 93-004341 $1,186,499.10 <br /> Contract No: 2007-00026 Current Amount: $1,368,079.46 <br /> PO 2007100421 Contract Award Date: 06/25/2007 <br /> Assessable: No Completion Date: 11/01/2007 <br /> Line Description Current Contract Estimated Payment Cumulative Totals $ Complete <br /> Last Chnq Ord Unit Price Unit Measure Quantity Amount Quantity Amount <br /> Quantity Amount <br /> PPP B 18TH] AGATE ST - HILYARD ST u~~`~~v <br /> General <br /> 0000 Liquidated Damages E. 18th/Aga ($500.00) DAY 0.000 $0.00 0.000 <br /> $0.00 0.00 <br /> 0010 MOBILIZATION $50,000.00 LUMPSUM 1.000 $50,000.00 0.000 <br /> $0.00 1.000 $50,000.00 100.00 <br /> 0020 TEMP. WORK ZONE TRAFFIC CONTRO $16,500.00 LUMPSUM 1.000 $16,500.00 0.000 <br /> $0.00 1.000 $16,500.00 100.00 <br /> 0021 CONSTRUCTION FENCING 001 $1.75 LINFT 252.000 $441.00 0.000 <br /> $0.00 252.000 $441.00 100.00 <br /> 0030 TEMPORARY STRIPING $1,500.00 LUMPSUM 1.000 $1,500.00 0.000 <br /> $0.00 1.000 $1,500.00 100.00 <br /> 0040 FLAGGERS $40.00 HOUR 500.000 $20,000.00 0.000 <br /> $0.00 556.500 $22,260.00 111.00 <br /> 0050 CITY PROVIDED SPEC INFO SIGNS $200.00 EACH 4.000 $800.00 0.000 <br /> $0.00 4.000 $800.00 100.00 <br /> 0060 EROSION CONTROL $4,000.00 LUMPSUM 1.000 $4,000.00 0.000 <br /> $o.oo l.ooo $a,ooo.oo loo.oo <br /> 0070 TREE PROTECTION $1,000.00 LUMPSUM 1.000 $1,000.00 0.000 <br /> $0.00 1.000 $1,000.00 100.00 <br /> 0080 TREE REMOVAL $400.00 EACH 12.000 $4,800.00 0.000 <br /> So.oo 12.000 $a,eoo.oo loo.oo <br /> 0090 FSNCS, RBMOVE $3.00 LINPT 240.000 $720.00 0.000 <br /> $0.00 301.000 $903.00 125.00 <br /> 0100 REMOVE PARKING METER POST $40.00 EACH 22.000 $880.00 0.000 <br /> $0.00 22.000 $880.00 100.00 <br /> 0110 RHMOVB AND 9ALVAGH SIGN $50.00 BACH 2.000 $100.00 0.000 <br /> $0.00 6.000 $300.00 300.00 <br /> 0120 REMOVE CATCH BASIN $150.00 EACH 1.000 <br /> $150.00 0.000 $0.00 1.000 $150.00 100.00 <br /> 0130 ALTER EX FENCE POST HASE $20.00 EACH 81.000 $1,620.00 0.000 <br /> $0.00 46.000 $920.00 57.00 <br /> 0131 MODIFY SIDEWALK 002 $665.28 LUMPSUM 1.000 $665.28 0.000 <br /> $0.00 1.000 $665.28 100.00 <br /> 0140 15 IN. SURFACING STABILIZATION $100.00 CIIYD 1.500 <br /> $150.00 0.000 $0.00 2.300 $230.00 153.00 <br /> 0150 17 IN. SURPACING 3TABILIZATION $75.00 CUYD 76.000 $5,700.00 0.000 <br /> $0.00 124.100 $9,307.50 163.00 <br /> 0160 GBNSRAL EECAVATION $10.00 CUYD 610.000 $24,400.00 0.000 <br /> $0.00 1,124.300 $44,972.00 184.00 <br /> 0170 3 INCH 3D PVC PIP& $5.00 FOOT 32.000 $160.00 0.000 <br /> $0.00 41.000 $205.00 128.00 <br /> <br /> 0180 10 INCH SD PVC PIPE $80.00 FOOT 52.000 <br /> $4,160.00 0.000 $0.00 0.000 $0.00 0.00 <br /> O1~ 10 INCH SD C900 PIPE $105.00 FOOT 23.000 $2,415.00 0.000 <br /> $0.00 23.000 $2,415.00 100.00 <br /> <br />