<br /> Contract Preliminary Progress Payment
<br /> Payment No 003
<br /> Contractor: EUGENE SAND & GRAVEL Original Contract: $1,186,499.10
<br /> Job 93-004422 Current Amount: $1,186,499.10
<br /> Contract No: 2007-00026 Contract Award Date: 06/25/2007
<br /> PO 2007100421 Completion Date: 11/01/2007
<br /> Assessable: No
<br /> Current Contract Estimated Payment Cumulative Totals ~ Complete
<br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantit Amount
<br /> 0900 18 INCH PVC STORM PIPE $110.00 FOOT 10.000
<br /> $l,loo.oo o.ooo $o.oo lo.ooo $l,loo.ao loo.oo
<br /> 0910 24 INCH PVC STORM PIPE $150.00 FOOT 45.000
<br /> $6,750.00 D ODO $0.00 50.000 $7,500.00 111.00
<br /> 0920 PIPE TEES, 10 INCH $600.00 EACH 1.000
<br /> $600.00 0.000 $0.00 0.000 $0.00 0.00
<br /> 0930 CONCRETE CLOSURE COLLARS $850.00 EACH 1.000 $850.00 0.000 $0.00 1.000 $850.00 100.00
<br /> 0990 CONCRETE MANHOLE, FLAT TOP $2,750.00 EACH 3.000
<br /> $8,250.00 0.000 $0.00 3.000 $8,250.00 100.00
<br /> 0950 CONCRETE INLETS, TYPE 4A $1,700.00 EACH 2.000
<br /> $3,400.00 0.000 $0.00 2.000 $3,400.00 100.00
<br /> 0960 CATCH BASINS, W/BIEE PROOF GRA $1,350.00 EACH 2.000
<br /> $2,700.00 0.000 $0.00 3.000 $4,050.00 150.00
<br /> 0970 REM/REPL CONCRETE CATCH BASIN $1,350.00 EACH 5.000
<br /> $6,750.00 0.000 $0.00 3.000 $4,050.00 60.00
<br /> 0980 ADJUSTING BOXES $350.00 EACH 5.000
<br /> $1,750.00 4.000 $1,400.00 4.000 $1,400.00 80.00
<br /> 0990 FILLING ABANDONED STRUCTURES $450.00 EACH 4.000
<br /> $l,aoo.oo o.ooo $o.o0 4.000 $l,soD.oo loo.ao
<br /> 1000 FILLING ABANDONED PIPES $150.00 CUYD 52.000 $7,800.00 0.000 $0.00 80.500 $12,075.00 155.00
<br /> 1010 PLUG EX. PIPE END WITH CONCRET $100.00 EACH 6.000
<br /> $600.00 0.000 $0.00 10.000 $1,000.00 167.00
<br /> 1020 MINOR ADJUSTMENT OF MANHOLES $1,000.00 EACH 5.000 $5,000.00 14.000 $14,000.00 14.000 $14,000.00 280.00
<br /> 1030 MANHOLES OVER EXISTING SEWERS $3,500.00 EACH 1.000
<br /> $3,500.00 0.000 $0.00 1.000 $3,500.00 100.00
<br /> 1040 REPAIR CATCH BASIN $1,100.00 EACH 1.000
<br /> $l,loo.oo o.ooo $o.DD l.ooD $l,loo.oo loo.oo
<br /> 1050 CONCRETE REINFORCED SADDLE $650.00 EACH 1.000 $650.00 0.000 $0.00 0.000 $0.00 0.00
<br /> 1060 MH REM/REPL FRAME/COVER-WW $250.00 EACH 4.000 $1,000.00 2.000 $500.00 2.000 $500.00 50.00
<br /> 1070 MH REM/REPL FRAME/COVER-ST $250.00 EACH L.000 $250.00 12.000 $3,000.00 12.000 $3,000.00 1200.00
<br /> 1080 COLD PLANE PVMT REMOVAL, VARIA $0.35 SQFT 161,338.000 $56,468.30 0.000 $0.00 163,670.000 $57,284.50 101.00
<br /> 1090 COLD PLANE PVMT REMOVAL, 0" TO $0.45 SQFT 36,074.000 $16,233.30 0.000 $0.00 26,082.000 $11,736.90 72.00
<br /> 1100 LEVEL 2, 3/8" DENSE HMAC $70.00 TON 928.000 $64,960.00 0.000 $0.00 0.000 $0.00 0.00
<br /> 1110 LEVEL 3, 1/2" DENSE HMAC $50.00 TON 2,883.000 $144,150.00 0.000 $0.00 3,274.600 $163,730.00 M 114.00
<br /> 1120 LEVEL 3, 3/4" DENSE HMAC $70.00 TON 197.000 $13,790.00 0.000 $0.00 258.300 $18,081.00 131.00
<br /> 1130 PLAIN CONCRETE PVMT, DOWELED, $6.50 SQFT 3,764.000 $24,466.00 0.000 $0.00 4,942.200 $32,124.30 131.00