Run Date: 10/02 07 14:46:19 <br /> Page 2 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 003 <br /> Contractor: EUGENE SAND & GRAVEL Oriyinal Contract: $1,106,499.10 <br /> Job 93-004341 Current Amount: $1,186,499.10 <br /> Contract No: 2007-00026 Contract Award Date: 06/25/2007 <br /> PO 2007100421 Completion Date: 11/01/2007 <br /> Assessable: No <br /> Current Contract Estimated Payment Cumulative Totals & Complete <br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantit Amount <br /> PPP E 18TH; AGATE ST - HZLYARD ST <br /> General ~t <br /> 0000 Liquidated Damages E. 18th/Aga 11l'~1~7 ~7J1~1 ($500.00) DAY 0.000 ~-p~ $0.00 0.000 $0.00 0.00 <br /> 0010 MOBILIZATION `11,{`lQ° 0 ~V ~ $50,000.00 LUMPSUM 1.000 $50,000.00 O.DDO , n\` \ $0.00 1.000 $50,000.00 100.00 <br /> 0020 TEMP. WORK ZONE TRAFFIC CONTRO yO~ 0 f/v $16,500.00 LUMPSUM 1.000 $16,500.00 0.200 ~$3,3OO.OD 0.800 $13,200.00 80.00 <br /> 0030 TEMPORARY STRIPING $1,500.00 LUMPSUM 1.000 $1,500.00 0.500 $750.00 1.000 $1,500.00 100.00 <br /> 0090 FLAGGERS $40.00 HOUR 500.000 $20,000.00 173.000 $6,920.00 556.500 <br /> 1jti~O ~ $22,260.00 111.00 <br /> 0050 CITY PROVIDED SPEC INFO SIGNS `V $200.00 EACN 4.000 $800.00 0.000 $0.00 2.000 $400.00 50.00 <br /> 0060 EROSION CONTROL $4,000.00 LUMPSUM 1.000 $4,000.00 0.200 $800.00 0.800 $3,200.00 80.00 <br /> 0070 TREE PROTECTION $1,000.00 LUMPSUM 1.DOG $1,000.00 0.400 $400.00 1.000 $1,000.00 100.00 <br /> 0080 TREE REMOVAL $400.00 EACH 12.000 $4,800.00 O.DOD $0.00 12.000 $4,800.00 100.00 <br /> 0090 FENCE, REMOVE ~ $3.00 LINFT 240.000 $720.00 O.ODO $O.OD 301.000 $903.00 125.00 <br /> 0100 REMOVE PARKING METER POST ~ $40.00 EACH 22.000 $880.00 0.000 $O.DO 22.000 $880.00 100.00 <br /> 0110 REMOVE AND SALVAGE SIGN 1 ~ $50.00 EACH 2.000 $100.00 4.000 $200.00 6.000 <br /> $300.00 300.00 <br /> 0120 REMOVE CATCH BASIN $150.00 EACH 1.000 $150.00 0.000 $0.00 1.000 $150.00 100.00 <br /> 0130 ALTER EX FENCE POST BASE $20.00 EACH 81.000 $1,620.00 0.000 $0.00 46.000 $920.00 57.00 <br /> 0140 15 IN. SURFACING STABILIZATION ~ .00 CUYD 1.500 $150.00 0.000 $0.00 2.300 $230.00 153.00 <br /> 0150 17 IN. SURFACING STAEILIZATION $75.00 CUYD 76.000 $5,700.00 O.D00 $0.00 124.100 $9,307.50 163.00 <br /> 0160 GENERAL EXCAVATION o(J n $40.00 CUYD 610.000 $24,400.00 0.000 $0.00 1,124.300 $44,972.00 184.00 <br /> 0170 3 INCH SD PVC PIPE , v ,IY: $5.00 FOOT 32.000 $160.00 6.000 $30.00 41.000 $205.00 128.00 <br /> 0180 10 INCH SD PVC PIPE ld0~o $80.00 FOOT 52.000 $4,160.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0190 10 INCH SD C900 PIPE a $105.00 FOOT 23.000 $2,915.00 0.000 $0.00 23.000 $2,415.00 100.00 <br /> 0200 12 INCH SD PVC PIPS I~a/~ $100.00 FOOT 7.000 $700.00 0.000 $0.00 57.000 $5,700.00 814.00 <br /> <br /> 0210 PIPE TEES, 10 INCH I~OI l $300.00 EACH 1.000 $300.00 0.000 $0.00 1.000 <br /> p $300.00 100.00 <br /> <br />