New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4421 Morse Bros Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4421 Morse Bros Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 4:39:03 PM
Creation date
6/13/2008 11:39:30 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004421
GL_Project_Number
975454
COE_Contract_Number
2007-00027
Retention_Destruction_Date
3/2/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ <br /> SHEET 4345-TC07: Add "NO LEFT TURN" sign at approximate Station 41+00 and as directed in the field. <br /> SHEET 4345-TC08: Add "NO LEFT TURN" sign at approximate Station 15+75 and as directed in the field. <br /> SHEET 4345-TC10: Add "NO LEFT TURN" sign at approximate Station 41+00 and as directed in the field. <br /> If you have questions about this addendum or the project, please call Steve Gallup with the City of Eugene, at <br /> (541 } 682-8460. <br /> <br /> All bidders shall acknowledge the receipt of and acceptance of this Addendum No. 1 by signing and submitting <br /> the signed Addendum with the bid. Bids submitted without this Addendum, or with the Addendum not signed, <br /> will be considered informal. <br /> ~'7~ <br /> ark Schoening,P.E. <br /> City Engineer <br /> Receipt acknowledged and conditions agreed <br /> this fZ' day of -~`~~t , 2007. <br /> Bidder: ~ot's~. ~ros, lu; ~=K-~~ ~`a~r <br /> By: <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.