Draft PROJECUDGET DEVELOPMENT SF`~ET <br /> City of Eugene Parks Planning <br /> PROJECT: Videra Park <br /> CAP. PROJ. <br /> DATE: 4.12.06 <br /> PM: P. Richardson <br /> BUDGET ALLOCATION <br /> SERVICES BUDGET <br /> Outalde Servlcea <br /> Geotechnlcal 0.0% $ 0 <br /> Environmental 0.0% $ 0 <br /> Survey 0.9% $ 3,000 <br /> A/E Pre-Design 0.0% $ 0 <br /> A/E Design 0.0°~ $ 0 <br /> A!E Design Contingency 0.0% $ 0 <br /> A/E Reimbursables 0.0% $ 0 <br /> Traffic Impact Analysis 0.0% $ 0 <br /> 1°,6 forARs 1.0°Jo $ 0 <br /> Bid Advertising 0.1% $ 650 <br /> Inspection & Testing 0.0% $ 0 <br /> subtotal 2.0% 3,650 <br /> In-House Servlcea <br /> Design Services 23.0% $ 80,500 <br /> Permits 1.1% $ 3,850 <br /> SDC's 4.3% $ 15,000 <br /> subtotal 28.4°~ 99,350 <br /> TOTAL NON-CONSTRUCTION 30.3% $103,000 <br /> CONSTRUCTION BUDGET <br /> excess/ <br /> General Construction budget estimate shoMall <br /> Contracted Construction 83.5% $ 222,300 213,208 <br /> Construction Contingency 10.0% $ 24,700 21,321 1 <br /> TOTAL CONSTRUCTION 73.5% 247,000 234,528 12,472 <br /> TOTAL PROJECT BUDGET <br /> Revenue <br /> POS Bond Measure Allocation 0.0% $ 0 <br /> Park SDC'S • 100.0% $ 350,000 <br /> Donations/ Fund Raising 0.0% $ 0 <br /> Other 0.0% $ 0 hypothetical <br /> TOTAL PROJECT BUDGET 100.0% 350,000 <br /> J <br /> NOTE: percentages rei/ect percentage of total project budget <br /> ~ i,-lti~ ~ , C ~ ~ n~~ i <br /> f 1 <br /> • l(~ ~d ~ 4v~~ <br /> <br /> Hawkins View Park Page 10(1 <br /> <br />