City of Eugene <br /> Bid Tabulation <br /> Bid #2007-000022 <br /> Job No. 93-004448 <br /> E. 18TH AVENUE STORMWATER BETWEEN RIVERVIEW STREET AND AUGUSTA STREET <br /> Engineer's Estimate H & J Construction Inc. Harold Primrose Excavating Wildish Construction Co <br /> Line <br /> No. Description uantit Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount <br /> 10 MOBILIZATION 1 LUMPSUM $10,000.00 $10,000.00 $12,OOD.00 <br /> 20 TEMP. WORK ZONE TRAFFIC CONTROL, COMPLETE 1 LUMPSUM $12,000.00 $9,990.00 $9,990.00 $24,000.00 $24,000.00 <br /> $6,500.00 $6,500.00 $3,500.00 $3,500.00 $4,768.00 $4,788.00 $5,200.00 $5,200.00 <br /> 30 EROSION CONTROL 1 LUMPSUM $2,500.00 $2,500.00 $750.00 <br /> 40 CLEARING AND GRUBBING $750.00 $1,234.00 $1,234.00 $500.00 $500.00 <br /> 1 LUMPSUM $5,000.00 $5,000.00 $500.00 $500.00 $3,796.00 $3,798.00 $2,300.00 $2,300.00 <br /> 50 REMOVAL OF STRUCTURES AND OBSTRUCTIONS 1 LUMPSUM $1,500.00 $1,500.00 $1,000.00 $1,OOO.DO $1,126.00 $1,128.00 $25D.00 $250.00 <br /> 60 GENERAL EXCAVATION 77 SQYD $35.00 $2,695.00 $15.00 <br /> 70 LEVEL 2 4 INCH, HMAC MIXTURE $1,155.00 $14.16 $1,090.32 $75.00 $5,775.00 <br /> 20 TON $135.00 $2,700.00 $145.D0 $2,9D0.00 $150.77 $3,D15.40 $247.00 <br /> 80 15 INCH PVC PIPE 343 FOOT $85.00 $29,155.00 $65.00 $4,940.00 <br /> 90 15 INCH CSP PIPE $22,295.00 $57.69 $19,787.67 $73.00 $25,039.00 <br /> 16 FOOT $100.00 $1,600.00 $55.00 $880.00 $60.40 $966.40 <br /> 100 12 INCH PVC PIPE 6 FOOT $77.00 $1,232.00 <br /> $60.00 $360.00 $61.00 $366.00 $57.52 $345.12 $94.00 $564.00 <br /> 110 10 INCH PVC PIPE 116 FOOT $50.00 $5,800.00 $49.00 <br /> 120 AGGREGATE BASE $5,684.00 $57.52 $6,672.32 $97.D0 $11,252.00 <br /> 32 CUYD $70.00 $2,240.00 $20.00 $640.00 $90.63 $2,900.16 $145.00 <br /> 130 CONCRETE MANHOLE, SHALLOW WITH SUMP 1 EACH $4,64D.00 <br /> $3,SD0.00 $3,500.00 $1,500.00 $1,500.00 $2,260.00 $2,260.00 $2,100.00 $2,100.00 <br /> 140 CONCRETE STORM DRAIN MANHOLES 1 EACH $2,400.00 $2,400.00 $2,000.00 <br /> 150 HMAC DRAINAGE CURBS $2,000.00 $2,580.00 $2,580.00 $2,700.00 $2,700.00 <br /> 71 FOOT $12.00 $852.00 $11.00 $781.00 $5.63 $399.73 <br /> 160 AREA DRAINS 1 EACH $21.00 $1,491.00 <br /> $750.00 $750.00 $1,OD0.00 $1,000.00 $990.00 $990.OD $1,200.00 $1,200.00 <br /> 170 CONCRETE INLETS, TYPE BS-L 2 EACH $2,000.00 $4,000.00 $1,600.00 <br /> 180 CONCRETE INLETS, TYPE D $3,200.00 $1,980.00 $3,960.00 $1,400.00 $2,800.00 <br /> 2 EACH $2,ODO.OD $4,OOD.00 $1,500.00 $3,000.00 $1,660.00 $3,320.00 $1,100.00 $2,200.00 <br /> 190 REMOVE AND REPLACE CMP 10 FOOT $75.00 $750.00 $70.00 <br /> 200 CONCRETE CAP $7D0.00 $90.00 $900.00 $45.00 $450.00 <br /> 6 CUYD $140.00 $840.00 $100.00 $600.00 $154.67 $928.02 $87.00 <br /> 210 TREE PROTECTION FENCING 75 EACH $4.00 $522.00 <br /> $300.00 $3.00 $225.00 $97.10 $7,262.50 $27.00 $2,025.00 <br /> 220 CONCRETE DRIVEWAYS 147 SQFT $15.00 $2,205.00 $20.00 <br /> $2,940.00 $16.50 $2,425.50 $16.00 $2,352.00 <br /> 230 Tree Protection Root Zane Excavation 16 HOUR $450.00 $7,200.00 $200.00 <br /> <br /> GRAND TOTAL: $3,200.00 $182.00 $2,912.00 $780.00 $12,480.00 <br /> $96,847.00 $70,816.00 $83,673.14 <br /> $116,012.00 <br /> ~~6 ~ ~ ~ <br /> ~ ~ <br /> ;K <br /> <br />