New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4441 Morse Bros Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4441 Morse Bros Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 9:47:37 AM
Creation date
6/12/2008 1:37:12 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004441
GL_Project_Number
975192
COE_Contract_Number
2007-00025
Retention_Destruction_Date
4/18/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
06i 01 /2007.13:05 FAX 541 682 841V t;t i r tuutiy~ ~ „ <br /> <br /> ' Public Works <br /> Engineering <br /> City of Eugene <br /> 244 East Broadway <br /> Eugene, Oregon 974p1 <br /> ADDENDUM N0.2 (541)882-5560 <br /> (541) 682-8410 Fax <br /> TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS FOIL <br /> 2007 ALPHA REI~A)ti ANA HOLLIS EXTENSION AT THE EUGENE AIRPORT <br /> JUNE 1, 2007 JOB #4441 BYD NUMBER 9 <br /> TO ALL PLANkIOLDEItS: <br /> The following changes shall amend and supplement the project bidding documents only to the extent <br /> specifically ahow~n acrd rooted, All other conditions shall remain the same. <br /> Bidders shall incorporate the effects of these changes in the appropriate bid items included in this <br /> addendum and the total of these bid items then add in the appropriate place on the bid form. <br /> CHANGES TO GENERAL PROVISIONS: <br /> 60-0150URCE O.F SYJPPY.'Y' ANn QYJ'AT.YT'Y XtEQUYREMEN'I'S <br /> (ADD) The following airport lighting equipment will be furnished by the Airport: Fifty-four <br /> (54} L-867 6" extensions: fifty (50) for Adjust Edge Light and four (4) for Adjust <br /> Elevated Signs. <br /> 80-08 FAILURE TO COMPLETE ON TIME <br /> Allo~vved Construction Time <br /> (CLARIFICATION} <br /> Alpha Rehab has a completion date of ~?ugust 22, 2007. Dallis Extension has a <br /> Completion Date of September 7, 2007. <br /> CHANGES TO TECHNIC,A,L SPECIFICATIONS <br /> 401.-2.3 BITUMINOUS MATERIAL <br /> (ADD) The binder (RTFO) aged residue shall be tested in accordance with AASHTO T 301 for <br /> Elastic Recovery tested at 25 degrees C. The recovery shall be 50% minimum. <br /> Tf you have questions about this addendum or the project, please call Patrick Cox at (54T) 682-6854. <br /> Addendum #2 - Job #4441 ~ ~ _ _ _ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.