~ <br /> Run Date: 11/06/2006 15:39:42 <br /> City of Eugene Page 2 <br /> Contract Preliminary Progress Payment <br /> Payment No 001 <br /> Contractor: WILDISH CONST. <br /> Job 93-004938 Original Contract: $123,136.00 <br /> Contract No: 2007-00014 Current Amount: $123,136.00 <br /> PO 2007100191 Contract Award Date: 10/20/2006 <br /> Assessable: No Completion Date: 10/30/2006 <br /> Line Descriution Last Chn Ord Current Contract <br /> Unit Price Unit Measure Estimated Payment Cumulative Totala <br /> Quantity Amount Quantity Amt ~ Complete <br /> COHURG RD SLDMP REPAIR Quantity Amount <br /> General <br /> 0000 Liquidated Damages ($1,000.00) DAY <br /> 0".000 $0.00 0.000 <br /> 0010 MOBILIZATION $0.00 0.000 $0.00 0.00 <br /> $28,200.00 LUMPSUM 1.000 $28,200.00 0.937 <br /> 0020 TEMP. WORK ZONg TRAFFIC CONTRO $12,323.40 0.937 $12,323.40 M 44.00 <br /> $15,000.00 LUMPSUM 1.000 $15,000.00 0.500 <br /> 0030 FABRIC, GEOTEXTZLE $7,500.00 0.500 $7,500.00 M 50.00 <br /> $2.00 SQYD 368.000 <br /> 0040 LOOP, CIRCULAR $736.00 422.000 $844.00 422.000 $844.00 <br /> $1,300.00 EACH 115.00 <br /> 2.000 $2,600.00 0.000 <br /> 0050 STRIPING $0.00 0.000 $0,00 0.00 <br /> $3,000.00 LUMPSUM 1.000 $3,000.00 0.000 <br /> 0060 CONCRETE MEDIAN $0.00 0.000 $0.00 0.00 <br /> $22.00 SQFT 102.000 $2,244.00 0.000 <br /> 0070 MOUNTABLE CURB $0.00 0.000 $0.00 0.00 <br /> $75.00 FOOT 32.000 <br /> 0000 CLSM $2,400.00 32.000 $2,900.00 32.000 $2,900.00 <br /> $150.00 CUYD 100.00 <br /> 5.000 $750.00 0.000 <br /> 0090 10" CORK, PE STM PZpE $0.00 0.000 $0.00 0.00 <br /> $60.00 LINFT 68.000 $4,080.00 63.000 <br /> 0100 ZNSTALL METER HOA $3,780.00 63.000 $3,780.00 93.00 <br /> $200.00 EACH 1.000 $200.00 1.000 <br /> 0110 LEVEL 3 DENSE, NMAC MIXTITRg $200.00 1.000 $200.00 100.00 <br /> $120.00 TON 288.000 $34,560.00 238.000 <br /> 0120 CONCRETE 7" REINF $28,560.00 238.000 $28,560.00 M 83.00 <br /> $20.00 SQFT 185.000 $3,700.00 170.000 <br /> 0130 GEOGRID $3,400.00 170.000 $3,400.00 92.00 <br /> $6.00 SQYD 736.000 $4,416.00 843.000 <br /> 0190 1 1/2-0 AGGREGATE BASE - 29" D $5,058.00 843.000 $5,058.00 115.00 <br /> $38.00 TON 500.000 $19,000.00 451.000 <br /> 0150 EROSION CONTROL $17,138.00 451.000 $17,138.00 M 90.00 <br /> $1,500.00 LUMPSUM 1.000 $1,500.00 0.500 <br /> <br /> 0160 CUT INTO EXISTG STRUCT - STM $750.00 0.500 $750.00 50.00 <br /> $750.00 EACH 1.000 $750.00 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> $123,136.00 $81,953.40 <br /> $81,953.40 <br /> <br />