Run Date: 10/2006 09:28:39 City .Eugene <br /> Engine Estimate <br /> Estimate: Preliminary Estimate , <br /> Job 93-004438 COBURG RD SLUMP REPAIR <br /> Line No. Description Quantity Unit Unit Price Amount • <br /> COBURG RD SLUM REPAIR 1/~~/ <br /> General j_ <br /> 0010. MOBILIZATION 1.00 LUMPSUM $10,000.00 $10,000.00 <br /> 0020. TEMP. WORK ZONE TRAFFIC CONTROL, COMPLETE 1.00 LUMPSUM $10,000.00 $10,000.00 <br /> 0030. FABRIC, GEOTEXTILE 368.00 SQYD $2.50 $920.00 <br /> 0040. LOOP, CIRCULAR 2.00 EACH $2,000.00 $4,000.00 <br /> 0050. STRIPING 1.00 LUMPSUM $2,500.00 $2,500.00 <br /> 0060. CONCRETE MEDIAN 102.00 SQFT $30.00 $3,060.00 <br /> 0070. MOUNTABLE CURB 32.00 FOOT $35.00 $1,120.00 <br /> 0080. CLSM 5.00 CUYD $100.00 $500.00 <br /> 0090. 10" CORR. PE STM PIPE 68.00 LINFT $50.00 $3,400.00 <br /> 0100. INSTALL METER BOX 1.00 EACH $200.00 $200.00 <br /> 0110. LEVEL 3 DENSE, HMAC MIXTURE 288.00 TON $90.00 $25,920.00 <br /> 0120. CONCRETE 7" REINF 185.00 SQFT $40.00 $7,400.00 <br /> 0130. GEOGRID 736.00 SQYD $6.00 $4,416.00 <br /> 0140. 1 1/2-0 AGGREGATE BASE - 29" DEPTH 500.00 TON $50.00 $25,000.00 <br /> 0150. EROSION CONTROL 1.00 LUMPSUM $250.00 $250.00 <br /> 0160. CUT INTO EXISTG STRUCT - STM 1.00 EACH $350.00 $350.00 <br /> Total General $99,036.00 <br /> Total COBURG RD SLUMP REPAIR $99,036.00 <br /> <br /> Total Preliminary Estimate $99,036.00 <br /> <br />