22. Effective Date. The effective date of the Contract shall be the latest date of signature by the parties. <br /> CONTRACTOR <br /> CITY OF EU <br /> <br /> Ci` . <br /> y, By: <br /> gna re) (signature) <br /> Angel L. Jones Guy Lorenzen <br /> City Manager Pro Tem President <br /> Date: ~ ~ Date: <br /> Public Improvement Contract for Use with Oregon Standard Specifications -Page 6 <br /> (Revised February 2004) <br /> <br />