page 6 of l 17 <br /> of o~~~ 02007 Total Amount Billed <br /> pro ect Costs As , TransacttonRemark <br /> <br /> Billable J Amot <br /> PM tit ~ ~ ~39i.oo <br /> l0l17/2007 3:23 45 uan <br /> Project Billed Acti- Resotuce Em to ed $39].00 g3_ <br /> 9_ <br /> lroo <br /> Billed By v~ Try <br /> to Tran1 <br /> 4437) $391•QO 8315,00 <br /> 2007 Slurry Seals ( tiT <br /> 0406 $315.00 Tl'6 RESULTS. F.'~-X. COQ <br /> Materials Testin T176 KESI_ LTS, FAX. CON1 A~ <br /> 3636213 $35 00 T176 RESULTS, FA?t. CONTAC <br /> 0.5 L"H $140.00 ?6,00 <br /> Base a gregates quality control (C~) ~ L-H $140.00 <br /> 285C g 1743054 Eng~neenngTechnician2 z L H SLURRY SEAL AC~G PICKI'P <br /> 09lOSn007 17412055 Engineering Technician 2 $76.00 SLURRY SE,4L AGG PICKUP <br /> 04(0672007 17412056 Engineering Technician 2 $7p 00 <br /> 09!07!2007 1 L'H $6.00 <br /> Aggregate sample pickup l H <br /> 32Z-5 17412043 Engrneering TeVANS n 7 <br /> p9/04l2007 I741~043 PASSENGER <br /> 09/04!2007 <br /> it <br /> ~ ~ <br /> <br />