Run Date: 07/18/2007 11:36:45 City of Eugene _ <br /> Estimate ribution <br /> r~ <br /> Estimate: 4437-slurry Seals - Blackline <br /> Job 93-004437 PPP - 2007 3LURRY SEAL PROJECT <br /> t <br /> Line No. Description Quantity Unit Unit Price Amount 1~ <br /> PPp - 2007 SLURRY SEAL PROJECT <br /> General <br /> 0010. MOBILIZATION 1.00 LUMPSUM $7,000.00 $7,000.00 <br /> 0020. TEMP. WORK ZONE TRAFFIC CONTROL, COMPLETE 1.00 LUMPSUM $8,000.00 $8,000.00 <br /> 0030. FLAGGERS 120.00 HOUR $32.00 $3,840.00 <br /> 0040. TEMPORARY STRIPING 850.00 FOOT $1.00 $850.00 <br /> 0050. EROSION CONTROL 1.00 LUMPSUM $500.00 $500.00 <br /> 0060. SLURRY SEAL 117,718.00 SQYD $0.83 $97,705.94 <br /> 0070. SLURRY SEAL CRACK SEALING 35,000.00 FOOT <br /> $0.55 $19,250.00 <br /> 0080. LEVEL 2, 1/2" DENSE, HMAC 210.00 TON $110.00 $23,100.00 <br /> 0090. PAVEMENT REMOVAL 5,500.00 SQFT $1.40 $7,700.00 <br /> Total General $167,945.94 <br /> Total ppp - 2007 SLURRY SEAL PROJECT <br /> $167,945.94 <br /> PPP - 2007 SLURRY SEAL PROJECT - Other / Direct <br /> General <br /> 0010. Printing 1.00 LUMPSUM $250.00 $250.00 <br /> 0020. Advertising 1.00 LUMPSUM $500.00 $500.00 <br /> 0030. Contingency 10~ of Contract $16,794.59 <br /> Total General $17,544.59 <br /> Total PPP - 2007 SLURRY SEAL PROJECT - Other / Direct $17,544.59 <br /> PPP - 2007 SLURRY SEAL PROJECT - Miscellaneous <br /> General <br /> 0010. Engineering Charge 13~ of Direct $24,113.77 <br /> 0020. AS-CONST. 11MONTH WARRANTY CHARGE 1.00 LUMPSUM $788.00 $788.00 <br /> Total General $24,901.77 <br /> Total PPP - 2007 SLURRY SEAL PROJECT - Miscellaneous $24,901.77 <br /> <br /> Total : 4437-Slurry Seals - Blackline $210,392.30 <br /> <br />