New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4464 Delta Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4464 Delta Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 9:58:51 AM
Creation date
6/11/2008 2:28:03 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004464
GL_Project_Number
975272
COE_Contract_Number
2007-00024
Retention_Destruction_Date
7/10/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
'03/~?/2007, 16:15 FAK 541 682 8410 C11Y tuu~nc rrr ci.u ___. <br />Public Works <br />Engineering <br />~ir- - <br />Gity of Eugene <br />244 East Broadway <br />Eugene, Oregan g7401 <br />(541)692-5560 <br />(541)682-8410 Fax <br />ADDENDUM NO. 5 <br />1'O THE CONTRACT D~CUMENTS AND SPECIFICATtONS FOR <br />AIRPdRT AIR CA-RGO RAMP EXPANSION IMPROVEMENTS <br />,AIP PROJECT N4. 3-41-0028-39 AND AIP PROJECT NO. 3-41-0028-~4Q <br />MAY 34~ 2007 JQB #4464 BID NUMBER S <br />Tt,~ AL~ PLANHOLbERS: <br />The foltawing changes shali amend and supplement the praject bidding documents only to the exten± <br />~ sp~cifically shown and noted. Ali other conditions shall rem~in the same. <br />Bidders shatl incorporate the effecfs of these changes in tha appropriate bid items included in tnis <br />addendum and the tatal of these bid items then add in the appropri~te place on the bid fortn. <br />' CHANGES TO BID SCHEDULE: <br />~~ (DELETE) Origina( 8id Schedule dated OS/25/2007 <br />(ADD) Revised Bid Schedule dated 05/3112047 <br />~ CHANt~ES TO PROVISIOM: <br />(CHANGE) P-159-2.a CyEUT~XTiLE FABRIC~ IYPE DF (Dr~irlage Flltration), <br />~ (DELETE) "Propex 2004" in the first sentence. <br />~ {CHANGE} SEGTION 401-2.3 BiTUMINt~U3 MATERIAL. <br />(AbCI) The modified binder must be an eiastamer modifier. <br />~ CHA_,,,_NGE5 TO EARTHWORK CALULATIQNS DRAWlNC~S~. <br />(DEI.ETE) Earthwork volume reparks included in Addendum No. 3. <br />~ (ADD) Attached Pages 1-7, dated 5/31/2407. <br />~ If you have questions about this addendum or the project, please cali Teri Higgins with the City ci <br />Eugene, at (5d1) 682-8462. <br />~ <br />~ <br />~ Addendum No, 5- Job #4464 Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.