05/,25/2007 13: 10 FAX ~41 682 8410 CITY EUGENE P1U ENR ~ ~~,; , <br />~ <br />ADDENbUM NO. 3 <br />City of Eugene <br />244 East Broadway <br />Eugene, Or~gon 97401 <br />(541 } 682-5580 <br />(541) 682-8410 Fax <br />TO THE GQNTRACT D~GUM~NTS AND SP~CIFt~AT10NS 1=0R <br />AIRPORT AIR CARGO RAMP EKPANSIdN (MPROVEMENTS <br />AIP PROJECT NO. 3-41-0Q28-39 AND AIP PROJEC7' NO. 3-41-0028-40 <br />Public Works <br />Engineering <br />MAY 25, 2007 JOB #4~64 BID NUMBER 8 <br />TC ALL PLANHOi.DERS: <br />The foliowing changes shall amend and supplement the project bidding documents on{y to the exten~ <br />specifically shawn and noted. A!1 ather conditions shail rem~in the same. <br />Bidders shall incorporate the effects of these changes in the ~ppropriate bid items included in thi~ <br />addendum and the tatal of these bid items then add in the appropriate place on the f~id forrn. <br />CHANGES TO BID SCHEDULE: <br />(pELETE) Original Bid Scttedu~e dated 0~/30/2007 <br />(ADD) Revised Bid Schedule dated 05/2512007 <br />GHANGES TO EARTHWORK CALULATIQN3 DRAWINGS: <br />(ADD~ Attached Pages 9-7 <br />If you have questions abQUt ti~is addendum o~ the project, please cali Teri Higgins with the City o~ <br />Eugene, at (541) 682-8462. <br />All bidders shall ack~owledge the receipt of and acceptance vf this Addendum Na. 3 by signing anc; <br />submitting the signed Addendum with the bid. Bids submiited without this Addendum, or with thF <br />Addendurn not signed, will be cons+dered informal. <br />~ <br />1" 4~'I/ .~--~ <br />Ma Schoe mg, P.~' <br />Cify Engineer <br />Receipt adcnowledged and condttions agreed <br />this ~ day of ~,~,~~, 2007. <br />Bidder: <br />~ ~ ey: ~,l~•. D.~ °~'a.c~~-~ ,~ll <br />Adde~dum No. 3- Job #4a64 Pege 1 <br />