F" <br />t p~t2?/2007 16:31 FAX 541 682 8410 CITV EUGENE Pw ENG ~ DELTA CONSTRUCTI C~00: ~~Or <br />~, . _ <br />Public Works <br />~ngineering <br />~ _ City of Eugene <br />244 Ea3t BrOadwdy <br />Eugene, Oregon 97401 <br />ADDENDUM N0. 1 (541) 682-8410 Fax <br />TQ THE C4NTRACT D4CUMENTS AND SPEGIFICATI~NS FUR <br />~ AIRPCIRT AfR CARG~ RAMP EXPAN51t~N IMPFtOV~M~NTS <br />AIP PROJECT NO. 3-41-0028-39 AND AIP PROJECT NO. 3~41-OQ28-40 <br />MAY 21, Z007 JOB #4464 <br />Tp ALL PLANHOLDERS: <br />BID NUMBER 8 <br />~'he following changes shall amend and supplement the project bidding documents on(y to the exte~~~ <br />specifically shown and noted. All other conditions shal( remain the same. <br />Bidders shall incarporate the affects of these changas i~ the appropriate bid items included in thls <br />addendum and the total af these bid items then add fn the appropriate place on the bid form. <br />CHANGES TO SPECIAL PROVISIONS: <br />(GHANGE) F-162 CHAIN LINK FENCES <br />(DELETE) P~ge ~-162-1, Deiete paragraph F-982-2.4 Gates. <br />~'` (CHANGE) Page F-162-2, Section 162-2.90, Change the first paragraph to read as follows: <br />Temporary barricades shall be orange AR24X96 bamcades, from Off 7he Wai; <br />Products, Inc., with reflective sheeting and one light per barricade or apptoved equal <br />The airport shall furnish 24 each AR24XS6 barricades #o be installed and used on thE: <br />praj~ct, The remaining AR24X96 barricades shali be fumished and installed by th~: <br />contractor. Alt temporary barricades shall becorne property of the airport at the <br />completion of the project. <br />(CHANGE) Page F-162-~1, Section 162-4.3, Change the first paragraph to read as follaws: <br />Temporary bamcades shali be~measured on a unit price basis per each, i~stalled anr <br />~ccepted, and removed when required due to phasing. <br />(DELETE) Page F-162-5, Delete paragraph F-16,2-4.5, <br />(DELETE) Page F-162-5, Delete paragraph F-162-5.3. <br />(ADD) Page F-162-5, add Section 162-5.4 and 162-5.5. <br />162-5.4 Tempo~ary barricades shall be paid at the contract unit price per each <br />installed and accepted, and moved when required due to phasing. <br />16Z-5.5 6~foot high chain link fence on tempor~ry b~rric~des shall be paid at thE <br />contr~ct unit price per linear foot, The price shall be full cornpensation fpr instailing th~ <br />~ barricades, furnishing all materials, and for all preparation, erectit~n, and installatian o~ <br />these materials, and for all labor equipment, tools, and incidentals necessary to <br />complete the item. Installed and accepted, and moved when required due to phasing. <br />~ <br />