CITY OF EUGENE <br />DEPARTMENT OF PUBLIC WORKS <br />ENGINEERING DIVISION <br />Change Order <br />~+ CONTRACTOR DELTA CONSTRUCTION <br />(ADDRESS) 999 OIVISION AVENUE <br />EUOENE OR 97404 <br />PROJECT: AIR CARGO RAMP EXPANSION IMPROVEMENTS <br />AIP PROJECT NO. 3-41-0028-38 6 40 <br />~ <br />~ <br />You are directed to make the following changes in this contracl: <br />contract <br />JOb # 4484 <br />Contract # 2007-24 <br />Change Order # 2 <br />Date: 09/26/07 <br />CAMS Date: <br />Reviswed by: Dete: <br />Inapeclor: Dan Durazo <br />Pro~. Mgr. ine <br />Pdndpal Ena. M. Cahill r~L~_ <br />It~m <br />No. <br /> <br />780 Rertave exoess excavatlon m altemate dis sal site. <br /> <br />790 Rertrove entl re aca fence for stortn i installetbn. <br /> <br />800 ConsWCtwerehouee rkin bt. <br /> <br />810 Mod CB's to C Standard. <br /> <br />820 Slu aeal exiatl ram . <br /> <br /> Chan e oA Inal contrect com tetlon date ot October 13 2007 to Oetober 22 2007. <br /> <br /> <br />This changes the bid items as follows: <br />Contract <br />Contract <br />Item <br />No. <br />Item Tima <br />Chan e Quantity <br />Units Unit <br />Cost <br />Amount <br />+/• Amended <br />Chan a Net <br />Chan e <br />0780 Rsmove Exeess Eucavatbn to ARemate Orl inal 0.00 0.00 0.00 50.00 <br /> Disposal Site Revised 0.00 0.00 0.00 <br /> Amended 1.00 LS 20131.00 Sz0131.00 20131.00 <br />0790 Remove and Replace Fence la Storm Pipe Ori Inal 0.00 0.00 0.00 ;0.00 <br /> Ins~latlon Revised 0.00 0.00 0.00 <br /> Miended 1.00 LS 1500.00 1500.00 1500.00 <br />080o Construct Warehouse Parlcing Lot - 0 inal 0.00 0.00 0.00 50.00 <br /> NON-ELiGIBLE Rev(sed 0.00 0.00 0.00 <br /> Amended 1.00 LS S37 869.00 37 869.00 37 869.00 <br />0810 Modiry CB's tn qry Standard Ori inal 0,00 0.00 0.00 ;0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 9.00 EA 500.00 500.00 4 500.00 <br />0820 Slurry Seal Existlng Ramp - NON-ELiGIBLE Ori Inal 0.00 0.00 0.00 ;0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 1.00 lS S10 504.00 ~30 504.00 SO 504.00 <br /> Orl Inal 0.00 0.00 .00 ;0.00 <br /> ReWSed 0.00 0.00 0.00 i <br /> Amended o.W 0.00 $0.00 0.00 <br />The original contract work days are o.o ae <br />The contrect time change this C.O ~.o aa s <br />The contract time cha~ge by previous C.O.'s 0.0 da s <br />The new contrad work da are ~.o de s <br />The original contract sum was <br />...............__ ............................................................................._..........___......._......_.._.___..._._._._.. <br />Net change by previous change order ,,_,,,,__.__.,.._.._..,_,..,,,.,, <br />._....... .._.____. ........~......__....__...._.. <br />Net change due to amsndment by prevtous change order <br />The contract sum prlor to this change order was <br />This change order wfll change contract sum by this amount <br />The new oontract net change sum <br />The new contrad amendment sum <br />........._....._...._.._~....... <br />The new contract sum including thls change order will be <br />Percenta e of ori inal contrad <br />NET CHANGE DUE TO AMENDMEN ••W~.~ <br />~ <br />V : <br />~ <br />City En~ineer ~~ ~tracto~{- Thir~ ~arty <br />[0-~-07 _a1ZZI~~I <br />Date Date Date <br />~ CONTRACTOR ~ OFFICE FILE ~ PURCHASINGICRO <br /> QIFORMS\PROJECTCONSTREVISED CHANOE ORDER.XLS <br />az.aes.sae.sa <br />~a~ss.szs.oot <br />ao.oo <br />as,zss,o~e.ss <br />E85,504.00 <br />(E193,929.00) <br />E85,504.00 <br />52.367.523.59 <br />-5.18% <br />2.63% <br />