Run Date: 02/06/2008 12:55:24 <br /> <br />City of Eugene Page 3 <br /> ~ Contract Preliminaty Progress Payment <br /> • Paymant No : 007 <br />Cont <br /> <br />Contr <br /> <br />Asae ractor: DSLTA CONST. <br />Job #: 93-004464 <br />act No: 2007-00024 <br />PO q: 200810D003 <br />seable: No Original Contract: $2,489,948.59 <br />CUrrent Amount: $2,383,455.31 <br />Coatract Award Date: 06/26/2007 <br />Comp2etion Date: I2/01/2007 <br /> <br />Line <br />Deacription Last Chng Ord <br />Unit Price <br />Unit Measure Clirrent Contract <br />Quantity <br />Amount Eetimated Payment <br />Quantity <br />Amovnt ~mulative Totals <br />aniit <br />Amoun[ ~ Canplete <br />0220 CRUSHED AGGREGATE BASE COURSE, $7.65 SQYD 182.000 <br />$1,392.30 <br />0.000 <br />$0.00 <br />120.000 <br />$918.00 <br />66.00 <br />0230 CEMENT T1tEATED BASE COURSE, 14 $15.21 SQYD 23,358.000 $355,275.18 0.000 <br />$0.00 <br />23,689.000 <br />$360,309.69 <br />M <br />101.00 <br />0240 BITUMINOUS SURFACE COURSE $50.00 TON 11,789.820 <br />$589,491.00 <br />0.000 <br />$0.00 <br />12,035.500 <br />$601,775.00 <br />M <br />102.00 <br />0250 ASPFiALT CONCRETE REINFORCSMENT $11.00 SQYD 674.000 $7,414.00 0.000 <br />$0.00 <br />297.~00 <br />$3,274.70 <br />44.00 <br />OZ60 AIRPIBLD MAREIN(3 $1.25 3QPT 5,576.400 <br />$6,970.50 <br />0.000 <br />$0.00 <br />7,714.000 <br />$9,642.50 <br />138.00 <br />0270 OBLITERATE EXISTING MARKING $1.45 SQFT 3,940.000 <br />$5,713.00 <br />0.000 <br />$0.00 <br />124.000 <br />$179.80 <br />3.00 <br />0280 TRAFFIC CONTROL SIGNS $250.00 EACH 1.000 <br />$250.00 <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0.00 <br />0290 12" RCP, CI.kSS IV $30.90 LINFT 894.000 <br />$27,624.60 <br />0.000 <br />$0.00 <br />743.000 <br />S22,958.70 <br />83.00 <br />0300 18" RCP, CLASS IV $43.50 LINFT I,316,000 $57,246.00 0.000 <br />$0.00 <br />1,207.000 <br />$52,504.50 <br />92.00 <br />0310 21" RCP, CLASS IV $56.25 LINFT 51.000 $3,373.65 0.000 <br />$0.00 <br />28.000 <br />$1,852.20 <br />55.00 <br />0320 24" RCP, CLASS IV $75.25 LiNPT 22.000 <br />$1,655.50 <br />0.000 <br />$0.00 <br />22.000 <br />$1,655.50 <br />100.00 <br />0330 8" PVC, C 900 $29.25 LINFT 271.000 <br />$7,926.~5 <br />0.000 <br />$0.00 <br />180.000 <br />$5,265.00 <br />66.00 <br />I 0340 6" UNDERDRAIN PIPE, COMPLETE $26.55 LINFT 3,329.000 <br />$B8,384.95 <br />0.000 <br />$0.00 <br />3,178.000 <br />$84,375.90 <br />95.00 <br />I 0350 CATCH BASIN 001 $2,953.00 EACH 9.000 <br />$26,577.00 <br />0.000 <br />$0.00 <br />11.000 <br />$32,483.00 <br />122.00 <br />I 0360 ORAINAGE MANHOLE $3,350.00 EACH 2.000 <br />$6,700.00 <br />0.000 <br />$0.00 <br />2.OQ0 <br />$6,700.00 <br />100.00 <br />I 0370 SUBDRAIN CLEANOUT $780.00 EACH 11.000 <br />$8,580.00 <br />0.000 <br />$0.00 <br />11.000 <br />$B,580.00 <br />100.00 <br />0380 ADJUST AIRCRAFT RATED INL6T/MA $1,410.00 EACH 4.000 <br />$5,640.D0 <br />0.000 <br />$0.00 <br />3.000 <br />$4,230.00 <br />75.00 <br />0390 OIL-WATER SEPERATOR $12,950.00 EACH 1.000 $12,950.00 O.OOD <br />$0.00 <br />1.000 <br />$12,950.00 <br />100.00 <br />0400 8-FOOT HIGH CHAIN LINA FENCE $18.00 LZNFT 992.000 $17,856.00 0.000 $0.00 830.000 $19,940.00 84.00 <br />0410 B-FOOT HIGH TEMPORARY CHAIN LI $5.50 LINF'f 2,184.000 $12,012.00 0.000 <br />$0.00 <br />2,138.000 <br />$11,759.00 <br />98.00 <br />0420 TEMPORARY BARRICADES $100.00 EA 23.000 $2,300.00 0.000 $0.00 23.000 $2,300.00 300.00 <br />0430 6' HZGH TEMP CSiA2N LINK FENCE $10.00 FT 296.000 $2,960.00 0.000 $0.00 324.000 $3,240.00 109.00 <br />0440 <br />i~ SEEDING, FERTILIZING AND MULCH $0.28 SQYD 24,780.000 $6,938.40 D.000 $0.00 24,107.000 $6,749.96 97.00 <br />045Q, SOOOV CABL~ N0. 8 $2.00 LINFT 13,300.000 $26,600.00 0.000 $0.00 11,500.000 $23,000.00 86.00 <br />~ ~ ~ ~ <br />