New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4464 CO4
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4464 CO4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 9:58:51 AM
Creation date
6/11/2008 2:03:57 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004464
GL_Project_Number
975272
COE_Contract_Number
2007-00024
Retention_Destruction_Date
7/10/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2 <br />AIP PROJECT N0. 3-41-0018 39 CHANGE ORDER N0. 4 <br />....._ _ .... _ . . _.....__ . <br />_ _ <br />(Supplemental Agreement) <br />AIRPORT Eu_,qene__ _ _! _ LOCATION Eugene, Ore on___ _____ <br />JUSTIFICATION FOR CHANGE <br />1. Brief description of the proposed contract change(s) and location(s). <br />0850 - Adjust Taxiway Conduits to revised grades: The taxiway lighting system conduits and installed <br />at a very specific grade (+\- 2 inches) during the rough grading operations. This allows them to enter <br />the light cans at an exact, predetermined elevation. <br />0860 - Relocate Electrical Vault outside of safety area: The project required the insfallation of two <br />electrical vaults for lighting and sign circuits. They are located on the south east corner of Lima and <br />the Ramp intersection. <br />0870 - Relocate Service at gate 293: In order to install a new storm pipe adjacent to Gate 293, the <br />existing electrical conduits required relocation. <br />0880 - Add Fiber Optic Patch Board Panel: The existing fiber to gate 293 comes from Gate 260. It <br />was an eight pair system and was at capacity. The contract required new fiber optic cables to be <br />pulled and terminalted in an existing enclosure. <br />2. Reason(s) for the change(s) (Continue on reverse if necessary) <br />0850 - Adjust Taxiway Conduits to revised grades: After the electrical contractor instalied the <br />conduits, grade changes were made by the enginee~ at both the Alpha-Lima intersection, and the <br />Alpha-Juliet intersections. The conduits needed to be adjusted to properly ~t into the light base cans. <br />0860 - Relocate Electrical Vault outside of safety area: The specified electrical vault did not have an <br />aircraft rated frame and cover. Rather than process a much more costly change order for an <br />upgraded vault, a new location was designated. The new lacation, outside of the safety area, is much <br />more practical from a maintenance and accessibility standpoint also. <br />0870 - Relocate Service at gate 293: In order to install a new storm pipe adjacent to Gate 293, the <br />existing electrical conduits ~equired relocation. <br />0880 - Add Fiber Optic Patch Board Panel: The contract required new fiber optic cables to be pulled <br />and terminalted in an existing enclosure, but the enclosure did not have enough room for a new patch <br />panel. This change added another enclosure adjacent to the existing one. <br />3. Justifications for unit prices or total cost. <br />0850 - Labor was tracked as Time & Material. <br />0860 - Labor was tracked as Time & Material. <br />0870 - Equipment, Labor and Material was tracked as Time & Material. <br />0880 - Price Agreement. <br />4. The sponsor's share of this cost is available from: <br />Airport Reserves ~ <br />~ ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.