~ <br />22. Effective Date. The effective date of the Contract shall be the latest date of signature by the parties. <br />~ <br />CITY OF EUGENE <br />~B <br />i,(,p/(sigjk~tt~Fe~'- " <br />~,~-- ~ <br />ngel L. Jones <br />City Manager Pro Tem <br />Date: <br />CONTRACTOR <br />gy: G~ c ~ <br />(signature <br />Phillip A. Heer <br />President <br />Date: L~~ ~~ L~ ~ <br />Public Improvement Contract for Use with Oregon Standard Specifications - Page 6 <br />(Revised February 2004) <br />