_ Run Date: ~il/05/2007 16:44:35 <br />~ , <br />City of Eu9ene ~ Page ~ <br />` ~ ~ Contract prog=eea Payment <br />Y <br />, ~ <br />pays~at No <br /> Contzactor: H 4 J CONST. <br />Job #: 93-004456 <br />Contract No: 2008-00001 <br />PO 8: 2000300128 Osiginal ContraCt: <br />Nzrent Amount: <br />Contract Award Date: OB/14/3 <br />Canpletion Da[e: 11/30/2 5729,203. <br />5739.203. <br />00~ <br />007 00 <br />00 <br /> Aaseeeable: No <br /> <br />Line Deacriotion Last Chng Otd <br />Unit Ptice <br />Unit Measure Niieat Contrac[ <br />Quantity Amount Setimated <br />Quantity Paymea[ <br />Amount Nmulative <br />antit TOtale <br />1lmount t Canplete <br /> 0450 CONSTRUCI' 6" PVC SAIIDLE CONN6C 5675. 00 EACH 18.000 $8,550.00 1.000 5475.00 4.000 $1,900.00 23.00 <br /> 0460 INTEPNAL S&RVICH CONNECTION $200. 00 HACH 7.000 $1,400.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0470 GROVP S6AL SVC CONN6CTION $350. 00 EACH 7.000 S7,a50.00 0.000 50.00 0.000 $0.00 ~•~4 <br /> 0480 BXCAVAT& FOR ACCESS TO GROUT P 5375. 00 EACH 2.000 5750.00 0.000 50.00 0.000 50.00 0.00 <br /> 0490 GROUT PILL ABANDONED WASTEWATE $100. 00 CUYD 7'1.000 $7,700.00 0.000 50.00 0.000 $0.00 0.00 <br /> 0500 POTNOLS 5375. 00 EACH 3.000 $1,125.00 1.000 53'15.00 3.000 $1,135.00 100.00 <br /> 0510 'N INSP6CTION 4 LOCATE EXISTIN $250. 00 EACH 15.000 $3,750.00 3.000 5750.00 6.000 51,500.00 <0.00 <br /> 0520 DYE TEST AND CONNECTION VERIFI 800. 00 SACX 69.000 $55,200.00 2.000 $1,600.00 71.000 $56,800.00 103.00 <br /> 0530 MAJOR VERIPICATION $1,500 .00 EACH 1.000 $1,500.00 0.000 50.00 0.000 50.00 0.00 <br /> 5~19,303.00 $146,4B4.3o S3a3,4B7.23 <br />