, G1TY OF EUGENE <br /> DEPARTMENT OF PUBLIC W012KS <br /> ENGINEERING DlVISION <br />Change Order <br />CONTRACTOR: E C Company <br />(,4~DRESS) 32758 Old Hwy 34 S.E. <br /> P.O. Box 925 <br /> Albany, OR 97321 <br />PROJECT: 2007 Audible Pedestrian Device Retrofit Proiect <br />You are directed to make the foliowing changes in this contract: <br />Job # 4453 <br />Contrect# 2007-22 <br />ChangeOrder# 2 <br />~ate: 11/26/07 ~ <br />CAMS Date; <br />Reviewed b : Date: <br />Insoector: Chades Heath <br />Prol. Mgc Steve Galluo <br />Principal Eng. Paul Klone <br />Item <br />No. <br />item Time <br />Change Quantity <br />(Units) Unit <br />Cost <br />Amount <br />(+/-) Amended <br />Change Net <br />Change <br /> Ori i~al 0,00 0.00 0.00 $0.00 <br /> Revised 0.00 0.00 0.00 <br />21 Tem ora Traffic Control for at 6th Ave. and Hi gh St. Amended 1.00 LS 1000.00 1,000.00 $1,000.00 <br /> Ori inal 0.00 0.00 OAO $0.00 <br /> ~ RevlSed a.oo~ o.o0 0.00 <br />31 Erosion Control for at 6th Ave. and High St. Amended 1.00 LS SOO.OD 500.00 $500.00 <br /> Ori inal 0.00 0.00 0.00 $0.00 <br /> Revised 0.00 0.00 0.00 <br />41 Install 8 audible Push Buttons at 6th Ave. and H igh St. Amen 8.00 EA 290. 2,320.00 $2,320.00 <br /> Ori inal 0.00 0.00 0.00 $0.00 <br /> Revised 0.00 0.00 0.00 <br />61 Remove and replace concrete waik including ADA Pedestri Amended 185.00 SF 33.00 6,105.00 $6 305.00 <br /> Ori inal 0.00 0.00 0.00 $0.00 <br /> Revfsed 0.00 0.00 0.00 <br />6Z Remave antl replace additional wncrete walk at 6th Ave. a qmendetl 1.00 LS 900.00 400.00 $400.00 <br /> Ori inal 0.00 0.00 0.00 $0.00 <br /> Revised 0.00 0.00 0.00 <br />63 Install Truncated Dome Texturing at 6lh Ave. an d HI h St. Amended 8.00 SF $62.00 496.00 $496.OD <br /> Ori inai 0.00 0.00 0.00 $0.00 <br /> Revised 0.00 0.00 0.00 <br />81 Saw Cutllng at at 6th Ave. and Hi h St Amended .00 LF $10.00 690.00 $640.00 <br /> Ori inal 0.00 0.00 O.OD $0.00 <br /> Revlsed 0.00 0.00 0.00 <br />110 Remove and replace concrete curb at 6th Ave. and Hi h St. Amended 29.00 LF $94.00 2,726.00 $2 726.00 <br />The original.contract work days are o.o da <br />The contract time change this C.O 0.0 da s <br />The contract time change by previous C.O.'s o.o da <br />The new contract work da s are o.o da <br />The original contract sum was ._ ........................................._.._._.._._..........__.........._........................~..___...._.._........................_....._..._ <br />Net change by previous change order ,..,,..,...~....... ......_...._.........._....._..___.__...................~......_........_ <br />Net change due to amendment by previous change order ~~~~~~~~~~~ ~~~~~~~~~ <br />.........____.._ ......................................_..____._...................................____. <br />The contract sum prior to this change order was . .,.__.,.._..,.,.,___ ,,.____,.._ _. ........... ....T .... . .....,...... . . <br />_ ............ .___.__..._. .. ...._._... <br />This change order will change contract sum by this amount <br />.. _... _ _... _. _ _ ................................................. _........ _.................... _..., <br />The new contract net change sum .__..___...._.__...._..._ ..................._.._........_....__........._........__.._...~. <br />The new contract amendment sum <br />._..._._ .............._.._..........__.............................,............_.........__.__..._._._......_._........___....._.__..__... <br />The new contract sum including this change order will be ,_,,,,,,,,, , <br />_._. ......................_..._....____.___....._.___........__.____..._.. <br />Percenta e of ori inal contract <br />NET CHANGE DUE TO AMENDMENTS -._..................._............_......_....._......._............_...........____....._....._._....._............... <br />Approval by: <br />City Engin er Prime Contractor Third Party <br />/~ ~i/~7 <br />Date ' Date Date <br />~ CONTRACTUR ^ OFFICE PILE ^ PURCHASING/CRO <br />s~a.~so.oo <br />$300.00 <br />$75,050.00 <br />$14,187.00 <br />So.oo <br />$14,487.00 <br />$89,237.00 <br />19.38 % <br />19.38% <br />(1~FORMSSPROJEC1lCON5TREVISED CHANGE ORDER.XLS <br />This changes the bid items as follows <br />Contract Centrar.t ~ ~ <br />