New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4453 EC Co Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4453 EC Co Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2010 2:19:32 PM
Creation date
6/10/2008 3:15:37 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004453
GL_Project_Number
975434
COE_Contract_Number
2007-00022
Retention_Destruction_Date
5/1/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION <br />BETWEEN: The City of Eugene, an Oregon ' <br />Municipal Corporation (City) <br />AND: EC Company (Contractor) <br />CONTRACT NO.: 2007 - 22 <br />JOB NO.: 4453 <br />PROJECT: 2007 AUDIBLE FEDESTRIAN DEVICE (ADS) AT VARIOUS LOCATIONS <br />RECITALS <br />Contractor was the successful bidder for the contract construction of the public improvement <br />project described in the plans and specifications for the project that were included in the bid documents <br />and the Oregon' Standard Specifications for Construction which form a part of this contract. <br />AGREEMENT <br />1. The Contract. The Contract between the City and Contractor (the "Contract") includes this <br />Document and its exhibits, together with all of the documents and materials included in the definition <br />of the "Contract" under the 2002 Oregon Standard Specifications for Construction issued by the <br />Oregon Department of Transportation, as modified by the City's Amendments to the Specifications, <br />Supplemental Specifications for the Project and any other Special Provisions included iri the Bid <br />Documents (all specifications and Special Provisions included in the Contract are collectively referred <br />to herein as the "Specifications"). In addition, the Contract between the City and Contractor shall be <br />deemed to incorporate all reports, records, laws, rules and orders referenced in the Coritract <br />documents. <br />This Document includes and incorporates the following Exhibits: <br />Exhibit A- City's Standard Conditions for Public Works Contracts <br />Exhibit B - Proposal Documents <br />Exhibit C- Certificate of Bidder/Contractor Employee Drug Testing Program <br />2. Definitions. Unless otherwise specifically defined in this Document, all capitalized terms which are <br />not proper nouns shall have the meanings assigned thereto in the Specifications. <br />3. Project. The project is generally described as: <br />2007 AUDIBLE PEDESTRIAN DEVICE (ADS) AT VARIOUS LOCATIONS <br />4. Work to be Performed. Contractor agrees to furnish, as the "Work" all services, labor, materials and <br />equipment which are described as the Contractor's responsibility in the Plans and Specifications, as <br />the same may be modified in accordance with the Contract, and to construct the improvement <br />described therein (the Project), all according to the provisions of the Contract. All parts of the Vllork <br />are the sole responsibility of Contractor. <br />5. Time of Commencement and Completion. Time is of the Essence of the Contract. The time in <br />which Contractor shall commence, prosecute and complete the V1/ork is described in the <br />Specifica#ions. <br />o~~~~~A~ <br />Public Improvement Contract for Use with Oregon Standard Specifications - Page 1 <br />(Revised February 2004) <br />_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.