CITY OF EUGENE
<br />DEPARTMENT OF PUBLIC WORKS
<br />ENGINEERING DIVISION
<br />Change Order
<br />CONTRACTOR: Triad Mechanicai, inc.
<br />(noottESS) Attn: Nolan Doyle
<br />1419 NE lombard Place
<br />Podland. OR 97211
<br />PROJECT: Mill Race Flow Control Structure
<br />You are directed to make the foilowing changes in this contract:
<br />Contract
<br />Contract
<br />Contract
<br />item
<br />No. Rem Time
<br />Change Quantity
<br />(Units) Unit
<br />Cost
<br />Amount
<br />(+/-) Amended
<br />Change Net
<br />Change
<br /> inal 0.00 0.00 0.00 $993.40
<br />30 Removal of Additionai Conaete Revised 1.00 LS 93.40 993.40
<br /> Amended 0.00 $0.00 $0.00 $0.00
<br /> Ori inal 0.00 0.00 0.00 $D.00
<br /> Revised 0.00 0.00 0.00
<br /> Amended 0.00 $0.00 $0.00 $0.00
<br /> Ori inal 0.00 0.00 0.00 E0.00
<br /> Revised 0.00 O.DO 0.00
<br /> Amended 0.00 #0.00 $0.00 #0.00
<br /> Ori inal 0.00 .00 .00 $o.oo
<br /> Revised O.W .00 .00
<br /> Amended 0.00 ¢0.00 $0.00 $0.00
<br /> Ori inal O.W .00 .00 $0.00
<br /> Revised 0.00 .DO 0.00
<br /> Amended 0.00 $0.00 $0.00 $0.00
<br /> Od Inal 0.00 0.00 D.00 $0.00
<br /> Revised 0.00 0.00 0.00
<br /> Amended 0.00 3~.00 $U.00 $U.OD
<br />The original contract woric days are 5.o da
<br />The contract time change this C.O 1.o da
<br />The contract time change by previous C.O.'s o.o da
<br />The new contract work da s are s.0 da
<br />The original contract sum was
<br />_._........_...._..__..____.....---..~.___......_____.._.___.__.r.____m.._..~__..___._._..__._..
<br />Net change by previous change order
<br />__...._ ................._.___________....~...__.~.~_.____..__.___-------
<br />Net change due to amendment by previous change order
<br />~_......._ ^.~ .._.._...__..~_...__..
<br />The conVact sum prior to this change order was _,__._.__,.._._____ N______...~.~...___...._..~_...._~
<br />This change order will change contract sum by this amount ,_,__,_,,,_,,,,_,,,,.,,,,,__,_,_,.,,,_._,., ~,,.~~..._,,,;_,,,,,,,,_.__
<br />The new contract net change sum
<br />._.._._-____ ~. ......._......_..._._......__.
<br />The new contract amendment sum
<br />._..__.._........_..._...»......._....._._.....__ ..._........_.._. ___.......___.._......___
<br />The new contract sum including this change order wi~l be
<br />__..._. ~__._.__._.__.~.._..___.__.....~
<br />Percenta e of ori inai contract
<br />_....._._.__.._.........._..._._..________.T__.__.________._._~_ ..__
<br />NET CHANGE DUE TO AMENDMENTS
<br />Fbaal b
<br />City EngineerAlC.F
<br />2~2~'~~
<br />Date
<br />~ CONTRACTOR ~ OFFICE FILE
<br />Prime Contrector
<br />Job # 4495
<br />Contrect# 200&00014
<br />Change Order # 1
<br />Dete: 02/19I08
<br />CAMS Date:
<br />ReNewed by. Date:
<br />Inspector. M. Koivula
<br />Proi. Mcr. J. Willer ~
<br />Principal Eng. , P. Klope
<br />aza,asa.,s
<br />SO.oo
<br />So.oo
<br />$28,463.16
<br />$993.40
<br />$993.40
<br />S0.0o
<br />$29,456.56
<br />3.49%
<br />0.00%
<br />Third Party
<br />Date Date
<br />~ PURCHASING/CRO
<br />QIFORMS~PROJECT~CONSTIREVISED CHANGE ORDER.XLS
<br />This changes the bid items as follows: