New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4477 Eugene Sand&Gravel Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4477 Eugene Sand&Gravel Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 10:03:15 AM
Creation date
6/10/2008 9:51:10 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004477
GL_Project_Number
975226
COE_Contract_Number
2008-00007
Retention_Destruction_Date
10/20/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PUBLIC IMPROVEMENT CONTRACT FOR USE WITH <br />OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION <br />BETWEEN: The City of Eugene, an Oregon <br />Municipal Corporation <br />AND: Eugene Sand & Gravel <br />CONTRACT NO.: 2008 - 07 <br />JOB NO.: 4477 <br />PROJECT: AIRPORT FLIGHTCRAFT 42" STORM RELOCATION <br />RECITALS <br />(City) <br />(Contractor) <br />Contractor was the successful bidder for the •contract construction of the public improvement <br />project described in the plans and specifications for the project that were included in the bid documents <br />and the Oregon Standard Specifications for Construction which form a part of this contract. <br />AGREEMENT <br />1. The Contract. The Contract between t~he City and Contractor (the "Contract") includes this <br />Document and its exhibits, together with all of the documents and materials included in the definitio,n <br />of the "Contract" under the 2002 Oregon Standard Specifications for Construction~ issued by the <br />Oregon Department of Transportation, as modified by the City's Amendments to the Specifications, <br />Supplemental Spe.cifications for the Project and any other Special Provisions included in the Bid <br />Documents (all specifications and Special Provisions included in the Contract are collectively referred <br />to herein as the "Specifications"). In addition, the Contract between the City and Contractor shall be <br />deemed to incorporate all reports, records, laws, rules and orders referenced in the Contract <br />documents. <br />This Document includes and incorporates the following Exhibits: <br />Exhibit A- City's Standard Conditions for Public Works Contracts <br />Exhibit B - Proposal.Documents <br />~xhibit C- Certificate of Bidder/Contractor Employee Drug Testing Program <br />2. Definitions. Unless otherwise specifically defined in this Document, all capitalized terms which are <br />not proper nouns shall have the meanings assigned thereto in the Specifications. <br />3. Project. The project is generally described as: <br />AIRPORT FLIGHTCRAFT 42" STORM RELOCATION <br />4. Work to be Performed. Contractor agrees to furnish, as the "Work" all services, labor, materials <br />and equipment which are described as the Contractor's responsibility in the Plans and Specifications, <br />as the same may be modified in accordance with the Contract, and to construct the improvement <br />described therein (the Project), all according to the provisions of the Contract. All parts of the Work <br />are the sole responsibility of Contractor. <br />Public Im rovement Contract for Use with Ore on Standard S ecifications - Pa e 1 0~~~~~~~ <br />P 9 p 9 <br />(Revised February 2004) <br />
The URL can be used to link to this page
Your browser does not support the video tag.