New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4518 Begin Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4518 Begin Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 10:39:17 AM
Creation date
6/9/2008 1:52:12 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004518
GL_Project_Number
985362
Identification_Number
Begin Warranty
Retention_Destruction_Date
12/20/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commencement and <br />Completion Dates for Contract Projects <br />Public Works <br />Engineering <br />Ciry of Eugene <br />244 E. Broadway <br />Eugene, OR 97401 <br />(541)682-5560 <br />DATE CONTRACT NO. <br />1 07 2008-12 <br />PROJECT NA JOB NO. <br />Acom Park 93004518 <br />CTOR FEDERAL AID PROJECT NO. <br />Scott Brown Construction Inc. <br />INSPECTOR PHONE NUMBER DATE OF AWARD <br />Josh Richmond 541.628.6018 921.2007 <br />FIRST NOTIFICATION <br />10.05.2007 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br />SECOND NOTIFICATION <br />SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br />BEYOND SPECIFIED COMPLEtED & THE TIME CHARGES STOPPED. <br />COMPLETION <br />~LL CLAIMS FOR ADDIl10NAL COMPENSA110N MUST BE SUBMRTED BY: <br />(SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br />Inspector Signature <br />THIRD NOTIFICATION <br />Notice of Completion. Begin Warranty Period. <br />12/01/2007 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br />PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br />REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br />IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #3 and #4, ALL WORK ISGUARANTEED <br />BY THE CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLEfiON. MANUFACTURE <br />WARRANTIE$ REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED <br />ONE YEAR. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT <br />BECOME EVIDENT WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-YEAR WARRANTY <br />PERIOD W ILLBE REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE RE <br />nspector Signature <br />For Privately Engineered Projects Only <br />Engineer: <br />Address: <br />, Owner: ~ ~ 0 l ~ ~ ~:' - ~ ~ ,~~, , ~ r ~ ~ ~~ <br />Address: <br />DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: ~ <br />~ <br />Contractor Engineer Owner Construction Manager <br />Fle Damon Joyner, PWM <br />ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION; <br />Maintenance-Planning Surety PW Administration - PIC Engineering PWE As Construct Monitor MADD Supervisor inspector <br /> <br />C:\Documents and Settings\cewejgr~My Documents\Projects~,4corn\First Second Third Notification.doc APRIL 2oDa ~~ <br />_ _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.