22. Effective Date. The effective date of the Contract shall be the latest date of signature by the parties. <br />CITY OF EUGENE <br />E` <br />/r""~ By: , v~._ <br />ignature) <br />Angei L. Jones <br />City Manager Pro Tem <br />CONTRACTOR <br />r <br />By: <br />(si nature <br />Conrad A. Sproul <br />President <br />oate: 3 - 2 ? • o~ <br />Date: ? 1 ~ <br />Public Improvement Contract for Use with Oregon Standard Specifications - Page 6 <br />(Revised February 2004) <br />