TRAFFIC CALMING ACRON PARK STREET SPEED HUMPS <br />Estimate ' <br />unit <br />Mobilization Is <br />TPDP Is <br />Erosion Control Is <br />Speed Bump ea <br />Legends is <br />Traffic Signs Complete ea <br /> <br />Engineering to date ~ <br />CE 2 (Though 2/18/08 ~urs) Hours <br />AET (Though 2/18/08 8:5hours) Hours <br />ET (Though 2/18/08 5.5) Hours <br />Engineering Est <br />CE 2 Hours <br />~' AET Hours <br />'' ET Hours <br />Signs (total of 8) ea <br />As-Constructs Is <br />Contingacy Is <br />qty unit $ total <br />1 $ 1;450.00 $ 1,450 <br />1 $ 1,750 $ 1,750 <br />1 $ 500 $ 500 <br />4 $ 1,500 $ 6,000 <br />1 $ 3,250 $ 3,250 <br />8 $ 250 $ 2,000 <br /> $ 14,950 <br />0 $ 98 $ - <br />8.5 $ 91 $ 774 <br />5 $ 79 $ 395 <br />~ $ 1,169 <br />3 $ 98 $ 294 <br />15 $ 91 $ 1,365 <br />8 $ 79 $ 632 <br /> $ 2,291 <br />8 $ 45.00 $ 360 <br />1 $ 200.00 $ 200 <br />1 $ 500.00 $ 500 <br />TOTAL $ 49,470 <br />