z ; i ~''' ~ ' <br />~ ~ ~ ' xYt <br />3 ~ y ~ s,t~.~~°: ~ <br />tbF <br />~, ~~ $ ,~s ~ . <br />~~~~~ . _ Public Warks <br />,'~~ f ~` ~z ' ° Engineering <br />~~..~ ~~ _ - <br />City of Eugene <br />244 ~ast Broadway <br />~ugene. bregon 97401 <br />(54~ ) 6e2-5560 <br />(54i)682-841D Fax <br />A,~IAENDUM NO. 1 <br />TQ THE C4NTRACT DOCUMENTS AI~TD SP~CIFICATIONS k'OR <br />' 200$ PAVEMENT PRESERVATION PROGRAM <br />~, X3'xH AYENiTE FROM FRANKLIN BOITLEVARD TO AGATE STREE'~' <br />~A,pril 11, 2008 .~OB #4446 BID NUMBER 11 <br />' ~'0 ALL PL~-NHOLD~R6: <br />~'~~,p ~`p(lpwif'1;~ vhar~ges 5hall amend and supplement the project bidding documents only to the extent <br />,-~pe~i~in~lly s}~own ~nd noted. All other conditions shall remain the same. <br />~~~dd~4t's ~h 5all incorporate the effects of these changes in the appropriate bid items included in this addendum and <br />s th~ tqt6~~ 0~'these ~id items then ac~d in the appropriate glace on the bid fvrrn. <br />,~~ a.tvCtr.S ~'O ~~D SC~EDULE: <br />(D~LETE) Original Bid Schedule dated 03/28/2008 <br />(ADD) Revised Bid Schedu~e dated 04/~X/20D8 <br />C~.A,NGES TO SPECYAY. ~'~tOVISIONS <br />00180.40 Limitations of Operations <br />~~p) ~Tp WOILK shall be allowed on May 17, and May 18, 2008. <br />If you have questions about this addendum or the project, please call Matt Rodrigucs with the City of Eugene, at <br />(sat) 682-6os6. , <br />Ala biddexs s~iail ac~utowledge the receipt of and acceptance of this Adde~dum No. 1 by signing a~td subnnitti~-g <br />the sign~d Add~ndum with the bid. Bids submitted without this Addendum, dr with the Addendum not signed, <br />will be considered informal. <br />~~ ~, ~ -~ <br />~- ,~` , ~ / <br />NIa"r~~hoex~ing^, IT~F <br />City Engineer <br />Reccipt aclmowtedged and conditions ag[eed <br />this ~ day of w~L-~, z008. <br />~ ~. <br />Bidder_ ~C~' ~ ' o*~ <br />By: ~-- <br />Addendum No. 1- Job #444.6 Page 1 <br />