,~ <br />PUBLIC IMPROVEMENT CONTRACT FOR USE WITH <br />OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION <br />BETWEEN: The City of Eugene, an Oregon <br />Municipal Corporation (City) <br />AND: Babb Construction dba: Delta Const. Co. (Contractor) <br />dba: Delta Concrete <br />CONTRACT NO.: 2008-00020 <br />JOB NO.: 4557 <br />PROJECT: 2008 PAVEMENT PRESERVATION PROGRAM VILLARD STREET CONCRETE <br />PANEL REPLACEMENT FROM E. 15T" AVENUE TO 300 FEET NORTH <br />RECITALS <br />Contractor was the successful bidder for the contract construction of the public improvement <br />project described in the plans and specifications for the project that rivere included in the bid documents <br />and the Oregon Standard Specifications for Construction which form a part of this contract. <br />AGREEMENT <br />The Contract. The Contract between the City and Contractor (the "Contract") includes this <br />Document and its exhibits, together with all of the documents and materials included in the definition <br />of the "Contract" under the 2002 Oregon Standard Specifications for Construetion issued by the <br />Oregon Department of Transportation, as modified by the City's Amendments to the Specifications, <br />Supplemental Specifications for the Project and any other Special Provisions included in the Bid <br />Documents (all specifications and Special Provisions included in the Contract are collectively referred <br />to herein as the "Specifications"). In addition, the Contract between the City and Contractor shall be <br />deemed to incorporate all reports, records, laws, rules and orders referenced in the Contract <br />documents. <br />This Document includes and incorporates the following Exhibits: <br />Exhibit A- City's Standard Conditions for Public Works Contracts <br />Exhibit B - Proposal Documents <br />Exhibit C- Certificate of Bidder/Contractor Employee Drug Testing Program <br />2. Definitions. Unless otherwise specifically defined in this Document, all capitalized terms which are <br />not proper nouns shall have the meanings assigned thereto in the Specifications. <br />3. Project. The project is generally described as: <br />2008 PAVEMENT PRESERVATION PROGRAM VILLARD STREET CONCRETE PANEL <br />REPLACEMENT FROM E. 15TH AVENUE TO 300 FEET NORTH <br />4. Work to be Performed. Contractor agrees to furnish, as the "Work" all services, labor, materials <br />and equipment which are described as the Contractor.'s responsibility in the Plans and Specifications, <br />as the same may be modified in accordance with the Contract, and to construct the improvement <br />described therein (the Project), all according to tfie provisions of the Contract. All parts of the Work <br />are the sole responsibility of Contractor. <br />Public Improvement Contract for Use with Oregon Standard Sp.ecifications - Page 1 ~/ ~~.~ ~~~~ <br />io,...:..,,a r„ti.~..,.., onnn~ <br />