New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4527 H&J Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4527 H&J Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 9:24:24 AM
Creation date
6/6/2008 1:25:50 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004527
GL_Project_Number
985422
COE_Contract_Number
2008-00023
Retention_Destruction_Date
4/30/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~~~~~ ~~ <br />~p ~p ic /, <br />r. fr Q. C~j' <br />r S G cc <br />y c~ <br />o~„ .. <br />~~~ <br />SPECIAL PROVISIONS FOR <br />CONCRETE PAVING, WASTW~4ITER AND STORMWATER SYSTEMS QN <br />6T" ALLEY FROM TYLER ST~2EET TO POLK STREET <br />JOB #4527 ' <br />00120.15 Examination of Work site and SoFicitation Documents; Consideration of <br />Conditions to be Encountered <br />(ADD) Inquiries regarding`#he plans, spe'cifications, and Contract docurnents shall be <br />made to: John Bonham -(541) 682-5300. <br />00150.50(a) General <br />(ADD) <br />~ Coordinate with EIIUEB Electric Operations-any exc~vation over 36 inches within <br />, <br />~ ~ 5 feet of any utility poles to determine if pole needs to be temporarily supported. <br />00170:89(a)" Protection of Utility, Fire-control, and Railroad Property and Services; <br />~ Coordination. ' . <br />(ADD) The Contractor shall avoid damaging existing wastewater service connections. If <br />. information was available, services are shown on the plans and the Contractor <br /> shall proceed.with caution when conducting underground work in the"se areas. If <br /> damaged and repairs a~e needed; the Contractor shall complete repairs prior to <br />' <br /> s , <br />commencement of excavation for alley pavement and shall be at the contractor <br />' expense. ~ <br />00180:31 Required.Materials, Equipment and Methods: <br />~ (ADD) Complete all storm and wastewater work items prior to commencement of <br />_ excavation for alley pavement. ~ <br />00180.50 Contract Tirne to Complete Work ' <br />(ADD) ;All wo~lc included in. this contract shall take place befinreen July 7 and September <br />" ""1;`2, 2008. Upon pro~ectwork eommencernent frst ~notification will b~e issued and~a <br />~ <br />. projeat. <br />day count will begin for twenty (20) work days to complete the <br />00180.85(b) Liquidated Damages <br />(ADD) Liquidated Damages shall be $300 per day and will apply to either the 20 <br /> "work day" construction period or the final completion date, whichever is <br /> exceeded. ~. <br />00220.40(e) Lane Restrictions <br />(ADD) Lane closures and street closure requests musf be submitted to the Engineer as <br /> part of a temporary traffic confrol plan. Polk and Tyler Streets must be comptetely <br /> re-opened to tra~c not later than 4:45pm each work day with appropriate <br /> temporary surfacing. <br />Speeial Specifications - Job #4527 ~ Page 1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.