SYSTEMS DEVELOPMENT CHARGE EXPENDITURE ALLOCATION WORKSHEET <br />Project Mame: Wastewater Lane County, PPP, Manhole Adjustment <br />Project Manager Name: Kris Olson <br />S@rvIC@ ID #(e.g. Good Job Number 004167): 4553 Contract #(e.g. 2ooa-osos): N/q Capitai Project #(e.g. eoszaa): <br />SDC Expenditure Requirements <br />Improvement Fees: May be spent only on capital improvements included in an adopted Capitai improvement Pian that increase capacity needed#o <br />provide service for future users, including those that provide new facilities or increase the capacity provided by existing facilities. <br />' <br />Wastewater Eligible: Non-assessable components of projects attributable to future development that drain those portions of pipes within the total area served by <br />the project. (Quantify portions of project that are capacity enhancing; pro-rate design/construction management costs on a proportionate basis.] <br />Stormwater Eligible: Non-assessable components of pipe or open channel projects attributable to future development that drain impervious surface areas within <br />the total drainage Basin served by the project. (Quantify portions of project that are capacity enhancing by determining the percent of project that will serve new <br />development: The total existing impervious area of basin divided by the future build-out impervious area of basin equals the percent of project serving existing <br />development. Subtract from 100% to derive the percentage of project that will serve new development.] <br />Transportation Eligible: Non-assessab/e components attributable to future development of 1) arterial and co/lector street projects and related tra~c signals, and <br />2) off-street bicycle path projects. (Quantify portions of project that are capacity enhancing; pro-rate design/construction management costs on a proportionate <br />basis. In the case of major enhancement projects (e.g. Ferry Street Bridge), use analysis to establish the percent of projected trips on the facility that can be <br />attributed to new development between year of construction and build out]. <br />Parks Eligible: Components of Neighborhood or Communiry park projects attributable to future development. (Quantify portions of project that are capacity <br />enhancing versus those portions needed to seive existing users. Pro-rate design/construction management cosfs on a proportionate basis.] <br />Reimbursement Fees: May be spent oniy on capitai improvements inciuded in an adopted Capital Improvement Plan, including those for new <br />facilities and rehabilitation of existing facilities. <br />Wastewater Eligible: Components nofed above as well as rehabilitation of existing systems (may also serve existing development). <br />Stormwater EligiBle: Components noted above as well as rehabilitation of existing systems (may a/so serve existing development). <br />Transportation Eligible: Per Council Resolution No. 4718, reimbursement fees will be budgeted for preservation and maintenance of the existing system <br />(Council or the Budget Committee may subsequently allocate some or all for a different purpose as allowed by law). No transportation reimbursement SDC <br />revenue is currently attributable to off-street bicycle paths; therefore no reimbursement fee expenditures are allowed for paths. <br />Parks Eligible: No parks SDC revenue is currenGy attributable to a reimbursement fee; therefore no reimbursement fee expenditures are allowed. <br />Allocation Costs & Percentages of Total Projecf Costs _ <br />Project Initfatfon Phase Bid Phase Final Phase <br />Wastewater Improve. Fee 54057 100 $ % $ % <br />Approved Amounts, if different: $ % $ % $ % <br />Wastewater Reimburse. Pee $ % $ ` % $ %o <br />Approved Amounts, 'rf different: $ % $ % $ % <br />Stormwater Improve. Fee $ % $ % $ % <br />Approved Amounts, if different: $ o~a $ o~a $ o~o <br />°Stortnwater Reimburse. Fee $ % $ >' % $ o/a <br />Approved Amounts, if different: $ % $ % $ % <br />Transportation Improve. Fee $ a/o $ o~a $ o~a <br />Approved Amounts, if different: $ % $ % $ % <br />Transportation Reimburse. Fee $ % $ ' :% $ % <br />; Approved Amounts, 'rf different: $ o~a $ ojo $ o~a <br />Parks Improve. Fee $ % $ % $ % <br />, Approved Amounts, if different: $ % $ % $ % <br />ParksReimburse. Pee $ N/A % $ ` N/A %o $ N/A % <br />Approved Amounts, if different: $ qo $ ojo $ o~a <br />.Expenditure AllocatPon Justification <br />Attach documentatlon that demonstrates justification of SDC funding of this capital project at projecf initiation phase as well as at ttme ofany <br />subsequent revisions of SDC ailocation amounts/percentages. ~ <br />State law requires an annual accounting of SDC expenditures by system at the project level. 'M SDC,expenditure may be legally challenged for up:to <br />two years after the expendifure. <br /> <br />' <br /> <br />Approved By: _ <br />9-`--- f ~ <br />r~~~ ~ ~ <br /> Da e: o~ ~ 7 0 Date: , ~~'~ Date: <br />Q:\PROJECTS\PROJ-3\4553\Design\Budget\4553-20080227SDCAllocationlr.xls Revised March, 2004 <br />