Run Date: 04/10/2008 11:01:53 <br />', <br />Estimate: PPP Chambers St. - RR to 8th - Wild ~ <br />Job #: 93-004346 PPP CH7-2~ERS; RAILROAD BLVD - 8TA <br />Line No. Description <br />PPP CHAMBBRS; RAILROAD BLVD - 8TH <br />General City of Eugene <br />Estimate r' '~sibution <br />~ <br /> <br />Quantity Unit Unit Price <br /> <br /> <br /> <br />mount <br />0010. MOBILIZATION 1.00 LUMPSUM $25,000.00 $25,000.00 <br />0020. TEMP. WORK ZONE TRAFFIC CONTROL, COMPLETE 1.00 LUMPSUM $24,000.00 $24,000.00 <br />0030. TEMPORP.RY STRIPING 1.00 LUMPSUM $11,000.00 $11,000.00 <br />0040. FLAGGERS 750.00 HOUR $40.00 $30,000.00 <br />0050. EROSION CONTROL 1.00 LUMPSUM $2,000.00 $2,000.00 <br />0060. SURFACING STABILIZATION 548.00 CUYD $85.00 $46,580.00 <br />0070. CITY PROVIDED SPEC INFO SIGNS 4.00 EACH $150.00 $600.00 <br />0080. ADJUSTING BOXES 4.00 EACH $250.00 $1,000.00 <br />0090. MINOR ADJUSTMENT OF MANHOLES 9.00 EACH $1,250.00 $11,250.00 <br />0100. MFi REM/REPL FRAME/COVER-WW 2.00 EACH $300.00 $600.00 <br />0110. MH REM/REPL FRAME/COVER-ST 7.00 EACH $300.00 $2,100.00 <br />0120. COLD PLANE PVMT REMOVAL, 2" DEEP 153,350.00, SQFT $0.23 $35,270.50 <br />0130. COLD PLANE PVMT REMOVAL, TAPER 0" TO 2" DEEP 38,710.00 SQFT $0.20 $7,742.00 <br />0140. COLD PLANE PVMT REMOVAL, TAPER 2" TO 4" DEEP 4,290.'•00 SQFT $1.16 $4,976.40 <br />0150. LEVEL 3, 1/2" DENSE HMAC 5,440.00 TON $53.00 $288,320.00 <br />0160. PVMT LEGEND, TYPE A2 or B: ARROWS 36.00 EACH $115.00 $4,140.00 <br />0170. PVMT LEGEND, TYPE A2 or S: BICYCLE LANE SYMBO 9.00 EACH $150.00 $1,350.00 <br />0180. PVMT LINE, TYPE A2 or B 1,445.00 SQFT $4.00 $5,780.00 <br />0190. MONO-DIRECTIONAL CRYSTAL TYPE I MARKERS 370.00 EACH $4.00 $1,480.00 <br />0200. BI-DIRECTIONAL YELLOW TYPE I MARKERS 215.00 EACH $4.00 $860.00 <br />0210. THERMOPLASTIC, NON-PROFILE, 90 MIL, EXTRUDED. 1.00 LUMPSUM $22,750.00 $22,750.00 <br />0220. LOOP DETECTORS INSTALLATION 103.00 EACH $350.00 $36,050.00 <br />0230. CONDUIT UNDER FiARD SURFACING 295.00 FOOT $82.00 $24,190.00 <br />0240. CONDUIT tJNDER LANDSCAPED AREAS 118.00 FOOT $51.00 $6,018.00 <br />0250. JUNCTION BOX, TYPE 1 2.00 EACH $300.00 $600.00 <br />0260. JUNCTION BOX, TYPE 2 6.00 EACH $350.00 $2,100.00 <br />0270. TEMPORARY VIDEO DETECTION INSTALLATION 4.00 EACH $650.00 $2,600.00 <br />0280. LOOP FEEDER WIRE 4,965.00 FOOT $1.25 $6,206.25 <br />Total : General $604,563.15 <br />Total : PPP CHAMBERS; RAILROAD SLVD - 8TH $604,563.15 <br />PPP CHAI~BRS; RAILROAD BLVD - HTH - Other / Direct <br />General <br />0010. CONTINGENCY 13~ of Contract $78,593.21 <br />0020. PAVEMENT TESTING 2~ of Contract $12,091.26 <br />0030. Advertising 1.00 LUMPSUM $165.00 $165.00 <br />0040. Printing 1.00 LUMPSUM $400.00 $400.00 <br />Total : General $91,249.47 <br />Total : PPP CHAMBTRS; RAILROAD BLVD - 8TH - Other / Direct $91,249.47 <br />PPP CHAI~ER3; RAILROAD BLVD - 8TS - Miacellanaous <br />Gen~ral <br />0010. Engineering Charge 15.5& of Direct $107,850.96 <br />0020. AS-CONST. 11MONTH WARRANTY CHARGE 1.00 LUMPSUM $1,200.00 $1,200.00 <br />Total : General . $109,050.96 <br />Total : PPP CHAMBSRS; RAILROAD BLVD - 8TH - Miscallasieous $109,050.96 <br />Total : PPP Chambers St. - RR to 8th - Wild $804,863.58 <br />