New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4422 Begin Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4422 Begin Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2010 4:48:56 PM
Creation date
6/5/2008 2:39:38 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004422
Identification_Number
Begin Warranty
COE_Contract_Number
2007-00026
Retention_Destruction_Date
5/1/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commencement and <br />Completion Dates for Contract Projects <br />Public Works <br />Engineering <br />City of Eugene <br />244 E. Broadway <br />Eugene; OR 97401 <br />(541) 682-5560 <br />DATE CONTRACT NO. <br />7/5/2007 07-26 <br />PROJECT NAME JOB NO. <br />PPP 2007 - Agate Street - E.13~' to E.22"d q422 <br />CONTRACTOR FEDERAL AID PROJECT N0. <br />Eugene Sand and Gravel N/A <br />INSPECTOR PHONE NUMBER DATE OF AWARD <br />Sharlett Rice 682-8826 6/25/07 <br />FIRST NOTIFICATION <br />7/5/07 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br />SECOND NOTIFICATION <br />SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br />BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br />COMPLETION <br />09/14J07 <br />ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: <br />(SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br />Inspector Signature <br />THIRD NOTIFICATION <br />Notice of Compietion. Begin Warranty Period. <br />04/01/081S THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK <br />EQUIPMENT AND <br />, <br />PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br />REQUIRED UNDER THE CONTRACT. THIRQ. NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br />IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT ~Ki, ALL WORK IS GUARANTEED BY THE <br />CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITI"S NOTICE OF WORK COMPLETION. MANUFACTURE WARRANTIES <br />REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN ~i EQUIRED ONE YEAR. <br />THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN OI~ THAT BECOME EVIDENT <br />WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-YEAR ~ERIOD WILL BE <br />REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR. i ' 1;~' <br />r` <br />In ' or Signature <br />For Privately Engineered Projects Only <br />Engineer: <br />Address: <br />Owner: <br />Address <br />DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br />Contractor Engineer Owner Construction Manager ,~~ File Damon Joyner, PWM <br />ADDITIONAL DISTRIBUTION FOR THIRD NOTIFI~~A~ION;;, <br />~ <br />Maintenance-Planning Surety P~~~~,~ <br />c~~im ratron PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br />w µ <br />Q:\PROJECTS\PROJ-2\4422\Correspondence\Contractors\4422 040108 Third Notification.doc APRIL 2004 M(~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.