Notification of Commencement and <br />Completion Dates for Contract Projects <br /> <br />Public Works <br />Engineering <br />City of Eugene <br />244 E. Broadway <br />Eugene, OR 97401 <br />(541) 682-5560 <br />DATE CONTRACT NO. <br />3/7/2008 2008-009 <br />PROJECT NAME JOB NO. i <br />34"' AVE STREAM ENHANCEMENT 87g7 <br />CONTRACTOR FEDERAL AID PROJECT N0. <br />OREGON WOODS <br />INSPECTOR PHONE NUMBER DATE OF AWARD <br />THOMAS FAHSBENDER 682-8818 9/5/07 <br />FIRST NOTIFICATION <br />9/10/07 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br />SECOND NOTIFICATION <br />SPECIFIED COMPLE`fION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br />BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br />COMPLETION <br />- 3/1/08 ' 0 2/26/08 <br />ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: 3/22/08 <br />(SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br />Inspector Signature <br />THIRD NOTIFICATION <br />Notice of Completion. Begin Warranty Period. <br />2I26/08 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br />PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br />REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br />IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #3 and #4, A~L WORK IS GUARANTEED <br />BY THE CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE <br />WARRANTIES REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED IENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED <br />ONE YEAR. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT <br />BECOME EVIDENT WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-Y ARRANTY <br />PERIOD WILL BE REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE,R~~AIR. ._ <br />- <br />~ <br />~ <br />"~ <br />~J-~B <br />' <br />-;-~ <br />Inspector Signature <br />For Privately Engineered Projects Only <br />Engineer: <br />Address: <br />Owner: <br />Address: <br />DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br />~ <br />File Damon Joyner, PWM <br />Contractor Engineer Owner Construction Manager~ <br />ADDITIONA~ DISTRIBUTION FOR THIRD NOTIFICATION: --- <br />Maintenance-Planning Surety °PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br />~ <br />~ <br />V" <br />~ <br />~ <br />\ <br />V <br />~ <br />Q:\PROJECTS\PROJ-7\3787\CORRESP\CONTRCTR\Third Notification - 3787.doc APR~~ 2ooa <br />