. . <br />~ <br />~ t ~ <br />Hollis Extension to Weyerhaeuser <br />~,,,.~ 8/10/2006 <br />Estimate Pre GJN <br />4" HMAC on 12" CTB on 6" Crushed Rock <br />150 x 35 If <br /> Unit Qty <br />mob-10% Is 1 <br />Safety/Security Is 1 <br />Erosion Control Is 1 <br />Excavation cy 356 <br />12" CTB sy 583 <br />6"base sy 583 <br />AC 4" tn 131 <br />Vailey Gutter If 150 <br />AD ea 1 <br />Fence If 240 <br />contingency 10% <br />field cores 5 ea <br />testing <br />engineering 25% <br /> Unit <br /> Cost Total <br />$ 4,600 $ 4,600 <br />$ 3,000 $ 3,000 <br />$ 500 $ 500 <br />$ 12 $ 4,278 <br />$ 20 $ 11,667 <br />$ 6 $ 3,500 <br />$ 75 $ 9,834 <br />$ 25 $ 3,750 <br />$ 1,200 $ 1,200 <br />$ 25 $ 6,000 <br /> $ 48,328 <br />TOTAL: <br />4,832.84 <br />$ 500 <br />$ 3,OQ0 <br />12,082.09 <br />$ 68,743 <br />