Flightcraft Improvements <br />i JN 4477 <br />For moving 42" SD and repaving affected portion of ramp <br />Segment of 42" SD underlaying new building (approx. 60') under separate contract <br />item qty units unit price extended <br />Mobilization 1.00 LS $5,897.50 $5,897.50 <br />Erosion Control 1.00 LS $1,000.00 $1,000.00 <br />Airport Safety and Security 1.00 LS $5,000.00 $5,000.00 <br />Large Pre-Cast Manhole 4.00 EA $3,000.00 $12,000.00 <br />Stnadard Manhole 1.00 EA $2,500.00 $2,500.00 <br />Remove 12"-15" Storm Pipe 100.00 FT $25.00 $2,500.00 <br />Remove/Abandon 42" Storm Pipe 40.00 FT $100.00 $4,000.00 <br />12" Storm Pipe 40.00 FT $40.00 $1,600.00 <br />42" Storm Pipe 150.00 FT $160.00 $24,000.00 <br />Sawcuf 150.00 FT $2.50 $375.00 <br />HMAC resurFace 1500.00 SF $4.00 $6,000.00 <br />$64,872.50 <br />Engineering $14,271.95 <br />Advertising $500.00 <br />Testing $2,000.00 <br />Warranty $500.00 <br />Contingency $6,487.25 <br />TOTAL $88,631.70 <br />