engineering and <br /> Construction Agreement ~ Publicworics <br /> Engineering <br /> "7 ~ City o1 Eugene <br /> Job Number: / Contract Number. 244 E. Broadway <br /> Eugene, OR 97401 <br /> Office File Number: Capital Project Number. (541)687-5560 <br /> FAX: (541)984-8410 <br /> The undersigned Owner requests the Public Improvements as described below: Tn'- (541)687-5245 <br /> Type of improvement: ~iA V f'J G . 5~4 tv r"t'~~ 5~ t~Z.. moo, 2t~ ~~W~~2 l~ ~~E Lt,$lkg , „ <br /> ~l~ (Paving, sanitary sewer, storm sewer, sidewalk, etc.) <br /> Location: 1? I~C l +y'Z~.F}• ~/Vl~~.~,(L <br /> (Street or easement. !f a subdivision, print subdivision name) <br /> North or st limit: South or west limit: <br /> (except for subdivisions) (except for subdivisions) <br /> be designed and constructed during the ~©~~or subsequent construction season in the following manner (check one): <br /> (Year) <br /> 1. As a City engineered and constructed project (eligible for assessment financing). <br /> City agrees: <br /> a) to perform engineering design, cost estimate, award of contract, construclion inspection, and assessment <br /> tabulation for the improvemerrts; o <br /> b) to particlpate in the cost of necessary additional capacity of improvements beyond the assessable amounts <br /> as stipulated in the Eugene Municipal Code. <br /> I <br /> Owner agrees: <br /> a) to pay all engineering and construcfion costs which are not eligible for assessment financing. <br /> b)rf the undersigned owner chooses to discontinue the City engineering and construction process prior to ~ <br /> execution of a constn~ction contract, the owner further agrees to pay all engineering and otherproject-relatedu <br /> costs incurred by the City to that point, and to comply with paragraph 2 below,rf applicable. <br /> 2. As a privately engineered and constructed project with private financing arranged by the Owner. <br /> Owner agrees: <br /> \ ~ <br /> a) to install all required public improvements at no cost to the City <br /> b) to pay actual City costs incurred for plan review and processing, inspection, materials testing, and other <br /> engineering services, all of which will be billed and payable monthly wfth final payment due prior to City's <br /> final acceptance of the completed improvements. <br /> c) to provide the City a bond, which includes aone-year warranty period, in an amount sufficient to cover all engineering and <br /> construction costs assoclated with completion of the required public improvements. <br /> d) to pay other charges and levies for public improvements, 'rf required. Other charges may include, but are not limited to: <br /> 1) penalty charges: in the event the property owner fails to make payment when due under this agreement, the property <br /> owner shall be charged a penalty in the amount of 825 or ten percent (10%) of the past due amount, whichever is <br /> greater. Payment of the penalty shall not oonsitute a waiver by the City of its other remedies. <br /> 2) interest charges: property owner shall pay interest on all past due amounts at the rate of eighteen percent (189'0) <br /> per annum from the due date until paid. This sum shall be in addition to penalty charges. <br /> 'PROPE TY OWNER CO-0WNER OF EUGENE <br /> P OWNER'S ~IE CO-0WNER'S NAME SIG TUBE <br /> U 17~ L~ <br /> ` J ~ ,r]p~/ SIGNATURE TfTLE j <br /> DAT (`+v DATE ~T~/~- <br /> I ~ I' L <br /> ~ ~ ADDRESS 777 PEARL STREET <br /> ~l~ v EUGENE, OREGON 97401 <br /> XCtTy T /ZIP ~ ' ~ CITY /STATE /ZIP <br /> 5 <br /> PHONE NUMBER (business hours) PHONE NUMBER (business hours) <br /> <br /> ENG (4Y9) ORIGINAL /CITY YELLOW /OWNER PINK /ENGINEERING AUGUST 1996 <br /> <br />