Broadway <br />4/26/2007 <br />Item <br />Mobilization <br />TPDT <br />Erosion Control <br />Saw Cutting <br />Excavation <br />Adjust Storm Structure <br />10" Decorative Concrete <br />3/4"-0 Crushed Rock <br />Geotextile Fabric <br />Design <br />Design/Build SUBTOTAL <br />PWE <br />Testing <br />Art Consultant <br />East and West of Willamette <br />Decorative Concrete, Design Build <br />Units Quantity Unit Cost Extended <br />LS 1 $13,035.37 $13,035.37 <br />LS 1 $5,000.00 $5,000.00 <br />LS 1 $1,500.00 $1,500.00 <br />LF 200 $2.00 $400.00 <br />CY 132 $40.00 $5,284.44 <br />EA 1 $1,000.00 $1,000.00 <br />SF 3567 $20.00 $71,340.00 <br />SY 396 $4.00 $1,585.33 <br />SY 396 $2.00 $792.67 <br />LS 1 $24,984.45 $24,984.45 <br /> $124,922.26 <br /> $12,000.00 <br /> $1,500.00 <br /> $5,000.00 <br />TOTAL $143,422.26 <br />