New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
PAF4495
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
PAF4495
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 10:29:18 AM
Creation date
6/4/2008 11:53:30 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Project Authorization
PW_Active
No
External_View
No
GJN
004495
GL_Project_Number
975236
Retention_Destruction_Date
1/14/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mill Race Railroad Culvert Gates <br />Projected Estimate <br />Modify the existing concrete dam structure and install two downward opening gates at the dual culvert <br />at the UO Facilities Mill Race "Pond" near Onyx Street north to the Willamette River. <br />Construction Costs Quantitv Units Unit Price Extended Total <br /> <br />Mobilization 1 LS $4,000 $4,000 <br />Erosion Control 1 LS $2,500 $2,500 <br />Dewatering 1 LS $5,000 $5,000 <br />Modify Existing Structure 1 LS $3,500 $3,500 <br />Install Downward Opening Gates 1 LS $25,000 $25,000 <br />Construction Sub-Total $40,000 <br />Other Costs <br />Contingency 10% $4,000 <br />Testing $400 <br />Engineering (Design + Construction) $17,000 <br />$21,400 <br />TOTAL $61,400 <br />
The URL can be used to link to this page
Your browser does not support the video tag.