T1 <br /> I <br /> <br /> L .I~ ~ <br /> En ineering an I Construction Agreement - city of Eugene <br /> Public Works Engineering <br /> 858 Pearl Street <br /> Jo Number Contract Number Ca rtal Pro'ect Number Eugene, OR 97401 <br /> p 1 541.682.5291 PHONE <br /> 541.682.5032 FAX <br /> The ndersigned Owner requests the Public Improvements as described below: <br /> Ty a of improvement ~ /G ~e~ <br /> jE~~T~~~i~,,~~r~,~ .~T <br /> (Pavingl <br /> wa/stYewoter, stormwate/%/st~reet lights) rr L/~/~~ <br /> Lo ation: ~ ~ ~ <br /> (Street oreasement. !fa subdivision, print subdivision name) G~/ <br /> ~ ~/Q~T~ <br /> N rth or east limit: South or west limit: <br /> (Except for subdivisions) (Except for subdivisions) <br /> bed signed and constr cted during the ~ or subsequent construction season in the following manner (check one): <br /> (Year) <br /> . As a City engine red and constructed project (eligible for assessment financing). <br /> ity agrees: <br /> (a) to performeng veering design, cost estimate, award of contract, construction inspection, and assessment tabulation for the improvements; <br /> (b) to participate i the cost of necessary additional capacity of improvements beyond the assessable amounts as stipulated in the Eugene <br /> Municpal Cod . <br /> wner agrees: <br /> (a) to pay all engi Bering and construction costs which are not eligible for assessment financing. <br /> (b) if the undersig ed owner chooses to discontinue the City engineering and construction process prior to execution of a construction <br /> contract, the o ner further agrees to pay all engineering and project-related costs incurred by the City to that point, and to comply with <br /> paragraph 2 b low, if applicable. <br /> 2 As a privately en ineered and constructed project with private financing arranged by the Owner. <br /> wner agrees: <br /> (a) to install all re uired public improvements at no cost to the City; <br /> (b) to pay actual ty costs incurred for plan review and processing, inspection, materials testing, and other engineering services, all of which <br /> will be billed a d payable monthly with final payment due prior to City's final acceptance of the completed improvements. <br /> (c) to provid ethe ity a bond, which includes aone-year warranty period, in an amount sufficient to cover all engineering and construction <br /> costs associate with completion of the required public improvements. <br /> (d) to pay other c arges and levies for public improvements, if required. Other charges may include, but are not limited to: <br /> 1) penalty ch rges: in the event the property owner fails to make payment when due under this agreement, the property owner shall be <br /> charged a enalty in the amount of $25 or ten percent (10%) of the past due amount, whichever is greater. Payment of the penalty shall <br /> not consti ute a waiver by the City of its other remedies. <br /> 2) interest c rges: property owner shall pay interest on all past due amounts at the rate of eighteen percent (18%) per annum from the <br /> due date ntil paid. This sum shall be in addition to penalty charges. <br /> PROPERTY O NER CO-OWNER CITY OF EUGENE <br /> PROPERT OWNER'S SIGNATURE CO-OWNER'S SIGNATURE SIGNATURE <br /> ~tL Gc}-~, ineP.r <br /> PROPERT OWNER's NAME CO-OWNER'S NAME TITLE <br /> DATE DATE DATE <br /> f 777 Pearl Street <br /> 'DDRESS ADDRESS <br /> ~ H ~ ' y0 Eugene, OR 97401 <br /> CITY/5T iE, IP CITY/STATE/ZIP <br /> ~Sl~ 7yG O~ Original to the City of Eugene <br /> P~DNEN MRERIbuslnesshours, PHDNENDMRER16uslnesshaurs, Copies to Owner, Co-owner, and Inspector <br /> i~ <br /> <br />