~ <br />/ <br />E <br />% <br />_ <br />", SYS7'EMS DEVELOPMENT CHARGE EXPENDITURE ALLOCATION WORKSHEET <br />ProjeCt Name: Hawkins Stormwater Improvement <br />Project Manager Name: Doug Singer <br />S@rviCC ID #(e.g. Good Job Number 004161): 4541 Contract #(e.g. zooa-osos): Capital Project #(e.g. eo5zaa): 955006 <br />SDC Expenditure Requirements <br />Irimprovement Fees: May be spent only on capitai improvements included in an adopted Capital ImprovemenYPlan that increase capacity needed to <br />piovitle service for future users, including those thatprovide new facilities or increase the capacity provided by existing facilities. <br />Wastewater Eligible: Non-assessable components of projects attributab(e to future development that drain fhose portions of pipes within the total area served by <br />the project. (Quantify portions of project that are capacity enhancing; pro-rate design/construction management costs on a proportionate basis.] <br />Stormwater Eligible: Non-assessab/e components of pipe or open channel projects attributable to future development that drain impervious surface areas within <br />the fotal drainage basin served by the project. (Quantify portions of project that are capacity enhancing by determining the percent of project that will serve new <br />development: The total existing impervious area of basin divided by the future build-out impervious area of basin equals the percent of project serving existing <br />development. Subtract from 100% to derive the percentage of project that will serve new development.] <br />Transportation Eligible: Non-assessable components attributable to future developmenf of 1) arterial and collector street projects and related tra~c signals, and <br />2) off-street bicycle path projects. (Quantify portions of project that are capacity enhancing; pro-rate design/construction management costs on a proportionafe <br />basis. In the case of major enhancement projects (e.g. Ferry Street Bridge), use analysis to establish the percent of projected trips on the facility that can be <br />attributed to new development between year of consfn~ction and build out]. <br />Parks Eligible: Components of Neighborhood or Communify park projects attributable to future development. (Quanti(y portions of project that are capacity <br />enhancing versus those portions needed to serve existing users. Pro-rate design/construction management costs on a proportionate basis.] <br />R~imbursement Fees: May be spent only on,capital improvements included in an adopted Capitai improvement Plan; including those for new <br />~ f, . ~ <br />fiacilities and rehabilitation of exi§ting facilities. <br />Wastewater Eligible: Components noted above as well as rehabilitation of existing systems (may also serve existing development). <br />Stormwater Eligible: Components noted above as well as rehabilitation of existing systems (may also serve existing development). <br />Transportation Eligible: Per Council Resolufion No. 4718, ~eimbursement fees will be budgeted for preservation and maintenance of the existing sysfem <br />(Council or the Budget Committee may subsequently allocate some or all for a different purpose as allowed by law). No transportation reimbursement SDC <br />revenue is currently attributable to off-street bicycle paths; therefore no reimbursement fee expenditures are allowed for paths. <br />Parks Eligible: No parks SDC revenue is currently attributable to a reimbursement fee; therefore no reimbursement fee expenditures are allowed. <br />'' Allocation Costs 8 Percentages of Tofal Projecf Costs <br />Project Initiafion Phase Bid Phase Final Phase ' <br />Wastewater Improve. Fee $ % $ % $ % <br />Approved Amounts, if different: $ % $ I % $ % <br />WastewaterReimburse.fee $ ~/a $ 9/0 $ ~/, <br />;. qpproved Amounts, if different: $ ~ % $ ~ %o $ % <br />Stormwater Improve. Fee $20,000 100% $ % $ % <br />Approved Amounts, if different: $ % $ % $ % <br />;>Stormwater Reimburse. Fee $ % $ % $ % <br />~~, -" Approved Amounts, 'rf tlifferent: $ ~ ~ ~ % $ ~ " o/p $ ~ ~ % <br />Transportation Improve. Fee $ % $ % $ % <br />Approved Amounts, if different: $ % $ % $ % <br />T~ansportation Reimburse. Fee $ "/o $ % $ % <br />' °~ Approved Amounts, 'rf different: $ % $ % $ % <br />ParksJmprove. Fee $ % $ % $ % <br />~'~,=ApprovecJ Amounts, if different: $ % $ % $ % <br />- : Parks Reimburse. Fee $ N/A % $ N/A % $ N/A % <br />~`Approved Amounts, if different: $ o~o $ g/a $ % <br /><Expenditure A//ocation Justifcation <br />Aftach documentation that demonstrates justification of SDC funding of this capital project at project initiation phase as well as at time of any <br />si~bsequent revisions of SDC ailocation amounts/percentages. ~~ <br />Stafe law requires an annual accounting of SDC expenditures by system at the project Ievel. An SDC expenditure may be legally Challenged for up to <br />filvo`years after the expenditure. <br />~; ~ ~ Approved By: ~~' ~ <br />~~~ <br /> --- ~~- <br />-~- --- <br /> Date: -- ~ Date: ~ ~ !? Date: <br />Q:\DARWINS\Singe~4541-20080111 SDC Wrksheet.xls <br />Revised March, 2004 <br />