Misc. Contracts & Agreements <br />No. 24516 <br />City-of Eugene Contract 2008-00220 <br />LOCAL AGENCY AGREEMENT <br />SURFACE TRANSPORTATION PROGRAM -URBAN <br />Roosevelt Boulevard: Beltline Highway -Chambers Connector <br />City of Eugene <br />THIS AGREEMENT is made and entered into by and between the STATE OF OREGON, <br />acting by and through its Department of Transportation, hereinafter referred to as "State' ; <br />arid the CITY OF EUGENE, acting by and through its designated officials, hereinafter <br />referred to as "City' ;collectively hereinafter referred to as the "Parties". <br />RECITALS <br />1. Roosevelt Boulevard is a ,part of the city street system under the jurisdiction and <br />control of City. <br />2. By the authority granted in ORS 190.110, 366.572 and 366.576, State may enter into <br />cooperative agreements with counties, cities and units of local governments for the <br />performance of work on certain types of improvement projects with the allocation of <br />costs on terms and conditions mutually agreeable to the contracting parties. <br />NOW THEREFORE, the premises being in general as stated in the foregoing RECITALS, <br />it is agreed by and between the parties hereto as follows: <br />TERMS OF AGREEMENT <br />1. Under such authority, City agrees. to rehabilitate the condition of pavement to a 20- <br />year pavement life; replace striping; and install American with Disabilities Act (ADA) <br />ramps on Roosevelt Boulevard from Chambers Connector to Beltline Highway. In <br />areas where surface stabilization is a concern, replacement of the entire structural <br />section will be done. The construction project described above is hereinafter <br />referred to as "Project". The location of the Project is approximately as shown. on the <br />sketch map attached hereto, marked "Exhibit A," and by this reference made a part <br />hereof. <br />2. The Project shall be conducted as a part of the Federal-Aid Surface Transportation <br />Program (STP) under Title 23, United States Code. The total Project cost is <br />estimated at $2,734,000, which is subject to change. STP-Urban funds for this <br />Project shall be limited to $1,367,000. The Project will be financed with STP-Urban <br />funds. at the maximum allowable federal participating amount ($9.73%), with City <br />providing the match (10.27%) and any non-participating costs, including all costs in <br />excess of the available federal funds. <br />Key No. 15407 <br />