Run Date: 10/23/2007 U.S. DEPARTMENT OF TRANSPORTATION Report: FMISD05A <br />Run Time: 11:57:41 FEDERAL HIGHWAY ADMINISTRATION Page 1 <br />FEDERAL-AID PROJECT AGREEMENT <br />STATE: OREGON PROJECT NO: 2385(054) STATE PROJ. NO: 15224 <br />THE STATE, THROUGH ITS HIGHWAY AGENCY, HAVING COMPLIED, OR HEREBY AGREEING TO COMPLY, WITH THE APPLICABLE TERMS <br />AND CONDITIONS SET FORTH IN (1) TITLE 23, U.S. CODE, HIGHWAYS, (2) THE REGULATIONS ISSUED PURSUANT THERETO AND (3) THE <br />POLICIES AND PROCEDURES PROMULGATED BY THE FEDERAL HIGHWAY ADMINISTRATION RELATIVE TO THE ABOVE DESIGNATED <br />PROJECT, AND THE FEDERAL HIGHWAY ADMINISTRATION HAVING AUTHORIZED CERTAIN WORK TO PROCEED AS EVIDENCED BY THE <br />DATE ENTERED OPPOSITE THE SPECIFIC ITEM OF WORK, FEDERAL FUNDS ARE OBLIGATED FOR THE PROJECT NOT TO EXCEED THE <br />AMOUNT SHOWN HEREIN, THE BALANCE OF THE ESTIMATED TOTAL COST BEING AN OBLIGATION OF THE STATE. SUCH OBLIGATION OF <br />FEDERAL FUNDS EXTENDS ONLY TO PROJECT COSTS INCURRED BY THE STATE AFTER THE FEDERAL HIGHWAY ADMINISTRATION <br />AUTHORIZATION TO PROCEED WITH THE PROJECT INVOLVING SUCH COSTS. ((Ju <br />PROJECT NORTH GAME FARM ROAD; OLD COLBURG RD -15 (EUGENE) NA WIDEN TWO LANES; ADD CENTER TURN LANE. <br />DESCRIPTION: BIKE LANE AND SIDEWALKS LANE <br />DUNS # : 80-958-0681 <br />CLASSIFICATION OF PHASE OF WORK EFFECTIVE DATE <br />TO BE PUT UNDER AGREEMENT OF AUTHORIZATION <br />HIGHWAY PLANNING &RESEARCH <br />PRELIMINARY ENGINEERING 10/15/2007 <br />RIGHT-OF-WAY <br />CONSTRUCTION <br />MCSAP <br />OTHER <br />PROGRAM URBAN/ TOTAL COST FEDERAL FEDERAL FUNDS ADVANCED CONST. <br />CODE WITH SHARE UNDER AGREEMENT FUNDS <br />L230 161 $257,000.00 89.73% $230,606.10 $0.00 <br />TOTAL $257,000.00 $230,606.10 <br />ESTIMATED TOTAL COST: $257,000.00 <br />TOTAL AUTHORIZED FOR PROJECT: $230,606.10 <br />DEPARTMENT OF TRANSPORTATION <br />AVAILABLE FUNDS CERTIFIED BY: LORRIE K. LINK DATE: 10/15/2007 <br />APPROVED AND AUTHORIZED BY: LORRIE K. LINK DATE: 10/15/2007 <br />AGRMT/MODIFY REQUESTED BY: STEVE R. LEEP DATE: 10/15/2007 <br />FEDERAL HIGHWAY ADMINISTRATION <br />PROJECT INFORMATION REVIEWED BY: STEVEN E. BAUMANN DATE: 10/16/2007 <br />APPROVAL RECOMMENDED BY: PHILIP G. TAYLOR .DATE: 10/22!2007 <br />APPROVED AND AUTHORIZED BY: PHILIP G. TAYLOR DATE: 10/22/2007 <br />STATE REMARKS: STP-2385(054 <br />K15224 <br />C3201940 <br />F18292 000,001 <br />F18923 421 <br />DIVISION REMARKS: <br />__ <br />