New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
955462 Forest Products Tax-Murray Hill
COE
>
PW
>
POS_PWM
>
AP
>
955462 Forest Products Tax-Murray Hill
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2016 12:37:28 PM
Creation date
1/25/2016 12:37:18 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
Identification_Number
9554692-922
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
If you are conducting timber harvesting or road construction within 100 feet of overhead utility <br /> lines contact the local utility in accordance with ORS 757.805 - Oregon's Overhead Safety Act <br /> and OAR 437-007-0230 - Power Line Safeguards. Identification tags are located on each pole. <br /> Call the Oregon Utility Notification Center at 811 at least 2 business days before starting timber <br /> harvesting, road construction, or any other activities involving excavation that may affect an <br /> underground utility line. The Center will coordinate with the appropriate utility companies to <br /> locate underground utility lines that may be affected by your activities. <br /> Fire Emergency Contact <br /> Matt Mellenthin <br /> 541-829-3601 <br /> LEGAL NOTICE <br /> The following section provides legal notification of the requirement to submit a written plan <br /> before certain portions of this Operation may begin. <br /> Statutory Written Plan <br /> A Statutory Written Plan may be required before operation activities begin near the protected <br /> resources listed in the following Operation information page(s) or otherwise described to you <br /> by the Stewardship Forester, OAR 629-605-0170. <br /> The Statutory Written Plan must describe in detail how the resource(s) will be protected during <br /> the operation. There is a waiting period for Statutory Written Plans that is separate from the <br /> notification waiting period. Contact the Stewardship Forester listed above for more <br /> information on Written Plans and waiting periods. <br /> A portion or all of your operation(s) may be eligible for a waiver of the Statutory Written Plan <br /> requirement. Use the Resource Description information provided on the following Operation <br /> page(s) in conjunction with Technical Note #10 to determine your eligibility. Go to the <br /> following link or contact your Stewardship Forester for more information: <br /> http://www.oregon.gov/odf/PRIVATE FORESTS/docs/20130816 Technote Flowchart Final.pdf <br /> Non-Statutory Written Plan: <br /> A Non-Statutory Written Plan may be required for resources or conditions in or near this <br /> Operation as determined by the Stewardship Forester, OAR 626-605-0170(10). <br /> Report generated on 8/7/2015 by Oregon Department of Forestry <br /> Forest Activity Electronic Reporting and Notification System (FERNS) <br /> Notification: 2015-781-10719 Page 3 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.