If you are conducting timber harvesting or road construction within 100 feet of overhead utility <br /> lines contact the local utility in accordance with ORS 757.805 - Oregon's Overhead Safety Act <br /> and OAR 437-007-0230 - Power Line Safeguards. Identification tags are located on each pole. <br /> Call the Oregon Utility Notification Center at 811 at least 2 business days before starting timber <br /> harvesting, road construction, or any other activities involving excavation that may affect an <br /> underground utility line. The Center will coordinate with the appropriate utility companies to <br /> locate underground utility lines that may be affected by your activities. <br /> Fire Emergency Contact <br /> Matt Fehrenbacher <br /> 541-435-0383 <br /> LEGAL NOTICE <br /> The following section provides legal notification of the requirement to submit a written plan <br /> before certain portions of this Operation may begin. <br /> Based on information provided by the applicant, no Statutory Written Plan is required at the <br /> time this notice was sent. A Statutory Written Plan may be required at a future date if new <br /> protected resources or other information is discovered. <br /> Non-Statutory Written Plan: <br /> A Non-Statutory Written Plan may be required for resources or conditions in or near this <br /> Operation as determined by the Stewardship Forester, OAR 626-605-0170(10). <br /> Report generated on 7/27/2015 by Oregon Department of Forestry <br /> Forest Activity Electronic Reporting and Notification System (FERNS) <br /> Notification: 2015-781-09971 Page 3 of 8 <br />